Laserfiche WebLink
<br /> <br />d. 2021 Community Crossings <br />Project No. 121-014 <br />Subcontracted under Rieth Riley <br />e. Roadway Reconstruction <br />Project No. 121-008 <br />Subcontracted under Rieth-Riley <br />f. Olive St. INDOT-LaPorte District <br />Subcontracted under Milestone <br />g. COSB Sheridan and Sample <br />Project No. 116-127A <br />Subcontracted under Rieth-Riley <br />3. Attach Information regarding any failure to complete any work awarded to you and the location <br />thereof. <br />a. N/A <br />4. Attach References from private firms for which you have performed work. <br />a. Jeremy Hemholdt, Scotty’s Ventures <br />p. (574)-276-5345 <br />b. Doug Unruh <br />p. (574)-229-5811 <br />c. Tom Rattenbury, New London Lakes <br />p. (269)-325-2586 <br />d. Marshall Steele, Weaver Heating and Cooling <br />p. (574)-276-2975 <br /> <br />Section II Plan and Equipment Questionnaire <br />1. Attach an explanation of your plan or layout for performing proposed work. <br />a. First submit MOT plan for approval. Concentrate on smaller areas to help maintain the <br />flow of traffic. Areas requiring road closures and detours will follow. Access to private <br />property will be maintained throughout the duration of the project. We plan to do <br />continuous work in all critical areas to open streets as quickly as possible. Work will be <br />to pull up brick and have a crew clean the brick while the other crew digs down to prep <br />for subbase. Install subbase and adjust any manholes, inlets, or valves to grade. Finally, <br />we will replace the brick as noted on the plans. If any bricks become damaged during <br />excavation, they will be replaced with approved street pavers that most closely match <br />existing pavers. During construction, all surrounding properties, structures, tenants, <br />visitors and their property will be preserved and protected from damage caused by the <br />construction operations. <br /> <br />2. Attach listing of the names and addresses of all subcontractors that you have used on public <br />works projects during the past five (5) years along with a brief description of work done by each <br />subcontractor.