Laserfiche WebLink
Portage Road Unincorporated Triangle Annexation Area 5 <br />K. Hiring Plan <br />It is anticipated that this annexation will not result in the elimination of jobs for <br />employees of any other governmental entities. The German Township Trustee has <br />been notified of this Annexation. <br />SECTION III. MUNICIPAL SERVICES <br />A. Public Works <br />Sewer - There is a sanitary sewer on the Portage Road boundary of this site. It is a <br />fifteen inch diameter pipe. It has adequate capacity for the annexation area. <br />Water - The South Bend Water Works currently has a 12" water main on the west <br />side of Portage that has more than adequate capacity for the annexation area. <br />Extensions of, or taps into sanitary sewer and water lines shall be governed by <br />I.C. 36- 9 -22 -2, I.C. 8 -1.5 -3 and 41 and the rules and regulations of the South Bend <br />Water Works and Sewer Utility. <br />Street Lighting - If the developer wishes to construct and dedicate additional or <br />decorative street lighting, the City will accept it for maintenance and operation. <br />Otherwise the annexation area property taxes will support additional contract street <br />lighting on Portage. <br />Streets - No new streets will be brought into the City's inventory. The City of South <br />Bend already maintains Portage Road along this area, so no additional capital <br />expenditures will be necessary. <br />A recently developed Kentucky Fried Chicken and the proposed Sonic Restaurant <br />to the north have sidewalks. As such, sidewalks will be required for this development. <br />Drainage Plan - Drainage facilities will be required to be constructed by the <br />developer and meet the latest City of South Bend standards. <br />Waivers of Annexation - No waivers of annexation are. in effect for the Annexation <br />Area. <br />Public Work General Budget Analysis <br />2008 Actual Budget Report for the Department: <br />Expenditures: <br />Miles of Roadway in City: <br />Cost per Mile: <br />New Mileage within Area: <br />Estimated Maintenance cost <br />for Annexation Area per year: <br />$6,303,240 <br />@480 <br />@$13,131.75 <br />@0 miles (0 feet) <br />@$0 <br />