Laserfiche WebLink
BID TABULATION <br />2021 Contractor Paving Round 2 <br />Project No: 121-031 <br />For Bids Due: June 8, 2021 <br />Division 1 <br />Item No.Description Quantity Unit Unit Price Item Total Unit Price Item Total Unit Price Item Total <br />1 Maintenance of Traffic 1 LS $35,049.72 35,049.72$ 14,103.00$ 14,103.00$ 22,992.00$ 22,992.00$ <br />2 Mobilization and Demobilization 1 LS $35,049.72 35,049.72$ 18,438.00$ 18,438.00$ 29,500.00$ 29,500.00$ <br />3 Milling, 3"22080 SY $2.50 55,200.00$ 3.90$ 86,112.00$ 3.90$ 86,112.00$ <br />4 HMA Surface, 9.5 mm – Type B 3637 TONS $70.00 254,590.00$ 76.00$ 276,412.00$ 75.00$ 272,775.00$ <br />5 HMA Wedge and Leveling – Type B 364 TONS $70.00 25,480.00$ 77.00$ 28,028.00$ 72.00$ 26,208.00$ <br />6 HMA for Patching 96 TONS $75.00 7,200.00$ 100.00$ 9,600.00$ 125.00$ 12,000.00$ <br />7 Tack Coat 9 TONS $1.29 11.61$ 1.00$ 9.00$ 1.00$ 9.00$ <br />8 Joint Adhesive, Surface 6952 LF $0.60 4,171.20$ 0.70$ 4,866.40$ 2.00$ 13,904.00$ <br />9 Adjust Manhole to Grade 6 EA $450.00 2,700.00$ 350.00$ 2,100.00$ 1,000.00$ 6,000.00$ <br />10 Adjust Inlet to Grade 1 EA $500.00 500.00$ 350.00$ 350.00$ 1,800.00$ 1,800.00$ <br />11 Line, Thermoplastic, Solid, White, 6"184 LF $2.75 506.00$ 7.50$ 1,380.00$ 7.50$ 1,380.00$ <br />12 Transverse Marking, Thermoplastic, Solid, White, 24"16 LF $10.00 160.00$ 45.00$ 720.00$ 45.00$ 720.00$ <br />13 Concrete Curb Ramp, Removal 350 SY $235.00 82,250.00$ 52.00$ 18,200.00$ 45.00$ 15,750.00$ <br />14 Concrete Curb Ramp, Installation 330 SY $280.00 92,400.00$ 165.00$ 54,450.00$ 155.00$ 51,150.00$ <br />DIVISION 1 TOTAL 595,268.26$ 514,768.40$ 540,300.00$ <br />Division 2 <br />Item No.Description Quantity Unit Unit Price Item Total Unit Price Item Total Unit Price Item Total <br />1 Maintenance of Traffic 1 LS 41,747.95$ 41,747.95$ 15,630.00$ 15,630.00$ 24,048.50$ 24,048.50$ <br />2 Mobilization and Demobilization 1 LS 41,747.95$ 41,747.95$ 20,391.00$ 20,391.00$ 30,200.00$ 30,200.00$ <br />3 Milling, 1.5"1500 SY 2.00$ 3,000.00$ 3.50$ 5,250.00$ 4.00$ 6,000.00$ <br />4 Milling, 3"25390 SY 2.50$ 63,475.00$ 3.90$ 99,021.00$ 3.35$ 85,056.50$ <br />5 HMA Surface, 9.5 mm – Type B 4327 TONS 70.00$ 302,890.00$ 76.00$ 328,852.00$ 75.00$ 324,525.00$ <br />6 HMA Wedge and Leveling – Type B 432 TONS 70.00$ 30,240.00$ 77.00$ 33,264.00$ 72.00$ 31,104.00$ <br />7 HMA for Patching 119 TONS 75.00$ 8,925.00$ 100.00$ 11,900.00$ 125.00$ 14,875.00$ <br />8 Tack Coat 9 TONS 1.29$ 11.61$ 1.00$ 9.00$ 1.00$ 9.00$ <br />9 Joint Adhesive, Surface 7656 LF 0.60$ 4,593.60$ 0.70$ 5,359.20$ 2.00$ 15,312.00$ <br />10 Adjust Manhole to Grade 5 EA 450.00$ 2,250.00$ 350.00$ 1,750.00$ 1,000.00$ 5,000.00$ <br />11 Adjust Inlet to Grade 1 EA 500.00$ 500.00$ 350.00$ 350.00$ 1,800.00$ 1,800.00$ <br />12 Line, Thermoplastic, Solid, White, 6"170 LF 2.75$ 467.50$ 7.50$ 1,275.00$ 7.50$ 1,275.00$ <br />13 Line, Thermoplastic, Solid, Yellow, 4"620 LF 0.80$ 496.00$ 1.50$ 930.00$ 1.50$ 930.00$ <br />Engineer's Estimate Milestone Contractors North IncRieth-Riley Construction Co., <br />Inc. <br />Engineer's Estimate Milestone Contractors North IncRieth-Riley Construction Co., <br />Inc. <br />Page 1 of 2