Rieth-Riley Construction Co., Inc.
<br />Equipment List
<br />3/31/2020
<br />Acquired New or
<br />Asset # Description
<br />Acquisition Date
<br />Used
<br />Cost
<br />Accum Depr
<br />NIBV
<br />MG40000006 GRADER 14G
<br />3/31/2005
<br />U
<br />20,188.00
<br />18,169.20
<br />2,018.80
<br />MG40000007 GRADER 140G
<br />3/31/2005
<br />U
<br />28,125.00
<br />25,312.50
<br />2,812.50
<br />MG40000008 GRADER 140G
<br />3/31/2005
<br />U
<br />61,500.00
<br />55,350.00
<br />6,150.00
<br />MG40000009 GRADER 160H
<br />3/31/2005
<br />U
<br />101,000,00
<br />90,900.00
<br />10,100.00
<br />MJS0000001 PATCHERJOINT SEALER
<br />4/11/2013
<br />N
<br />41,810.25
<br />41,810.25
<br />-
<br />MJS0000002 PATCHER JOINT SEALER
<br />4/11/2013
<br />N
<br />41,810.25
<br />41,810.25
<br />-
<br />MJS0000003 PATCHER JOINT SEALER
<br />4/11/2013
<br />N
<br />41,810.25
<br />41,810.25
<br />-
<br />M150000004 PATCHER JOINT SEALER
<br />4/11/2013
<br />N
<br />41,810.25
<br />41,810.25
<br />-
<br />M150000005 PATCHER JOINT SEALER
<br />4/1/2017
<br />N
<br />46,587.80
<br />27,952.68
<br />18,635.12
<br />MJ50000006 PATCH ER JOINT SEALER
<br />4/1/2017
<br />N
<br />46,587.80
<br />27,952.68
<br />18,635.12
<br />MJS0000007 2019 ONLINE M4DHPJOINTSEALER
<br />12/4/2019
<br />U
<br />51,376.67
<br />3,425.12
<br />47,951.55
<br />MM05000001 COLD PLANER ROTOMILL
<br />3/1/2005
<br />U
<br />47,500.00
<br />42,750.00
<br />4,750.00
<br />MSTOOOOQ17 TRUCK SERVICE
<br />7/1/2016
<br />U
<br />'15,000.00
<br />13,500.00
<br />1,500.00
<br />MTA0000001 MATERIAL TRANSFER ASPHALT
<br />12/15%2017
<br />N
<br />171,415.61
<br />114,277.08
<br />57,138.53
<br />MTA0000002 MATERIAL TRANSFER ASPHALT
<br />12/15%2017
<br />U
<br />142,834.02
<br />95,222.68
<br />47,611.34
<br />MW000003 2012 WEILDER E28-90 ASPHALT TRANSFER
<br />12/23/2019
<br />U
<br />75,039.06
<br />8,337.68
<br />66,701.38
<br />MTA0000004 2012 WEILDER E2850 ASPHALTTRANSFER
<br />12/23/2019
<br />U
<br />65,520.38
<br />7,280.04
<br />58,240.34
<br />MTAOCOOD05 MATERIAL TRANSFER ASPHALT
<br />4/8/2015
<br />N
<br />519,680.31
<br />324,800.28
<br />194,880.03
<br />MTA0000006 MATERIAL TRANSFER ASPHALT
<br />4/26/2016
<br />N
<br />408,428.15
<br />233,387.52
<br />175,040.63
<br />MTA0000008 MATERIAL TRANSFER ASPHALT
<br />4/27/2016
<br />N
<br />499,455.56
<br />249,727.68
<br />249,727.88
<br />MTA0000009 MATERIAL TRANSFER ASPHALT
<br />5/26/2016
<br />N
<br />499,455.56
<br />244,525.02
<br />254,930.54
<br />MTA0000010 MATERIAL TRANSFER ASPHALT
<br />5/26/2016
<br />N
<br />499,455.56
<br />244,525.02
<br />254,930.54
<br />MTC0000001 MATER IALTRANSFERCONCRETE
<br />8/9/1994
<br />N
<br />199,660.00
<br />179,694.00
<br />19,966.00
<br />MTCOOO0002 MATERIAL TRANSFER CONCRETE
<br />4/21/1995
<br />N
<br />243,376.79
<br />230,072.37
<br />13,304.42
<br />MTCOOO0003 MATERIAL TRANSFER CONCRETE
<br />11/5/2001
<br />N
<br />85,746.92
<br />66,743.92
<br />19,003.00
<br />MTC0000004 MATERIAL TRANSFER CONCRETE
<br />2/22/2016
<br />N
<br />107,025.00
<br />107,025.00
<br />-
<br />OD78000001 COMPACTOR VIER 78"" HD120 V
<br />4/1/2017
<br />N
<br />32,677.80
<br />29,410.02
<br />3,267.78
<br />OD78000002 COMPACTOR VIBR 78"" HD120 V
<br />12/15/2017
<br />N
<br />25,304.16
<br />11,808.60
<br />13,495.56
<br />OD78000003 2014 HAMM HD120VO 78" VIBR COMPACTOR
<br />12/23/2019
<br />U
<br />25,853.40
<br />2,585.36
<br />23,268.04
<br />OD78000004 2014 HAMM HD120VO 78" VIBR COMPACTOR
<br />12/23/2019
<br />U
<br />24,783.13
<br />2,478.32
<br />22,304.81
<br />OD78000005 2014 HAMM HD120VO 78" VIBR COMPACTOR
<br />12/23/2019
<br />U
<br />24,783.13
<br />2,478.32
<br />22,304.81
<br />0078000006 COMPACTOR VIBR 7811" HD+1201
<br />4/30/2018
<br />U
<br />23,978.45
<br />81961.92
<br />15,016.53
<br />OD78000007 COMPACTOR VIBR 7811" HD+1201
<br />4/30/2018
<br />U
<br />28,417.09
<br />10,620.94
<br />17,796.15
<br />OD78000018 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />180,219.03
<br />18,585.05
<br />161,633.98
<br />0078000019 2019 CATERPILLAR C013 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />180,219.03
<br />18,585.05
<br />161;633.98
<br />CD78000020 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />180,219.03
<br />18,585.05
<br />161,633.98
<br />OD78000021 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />180,21903
<br />18,585.05
<br />161,633.98
<br />OD78000022 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />185,435.28
<br />19,123.06
<br />166,312.22
<br />OD78000023 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />185,435.28
<br />19,123.06
<br />166,312.22
<br />OD78000024 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />185,435.28
<br />19,123.06
<br />166,312.22
<br />OD78000025 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />185,435.28
<br />19,123.06
<br />166,312.22
<br />OD78000026 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />185,435.28
<br />17,384.60
<br />168,050.68
<br />0078000027 2019 CATERPILLAR CB13 78" VIBRATORY COMPACTOR
<br />5/24/2019
<br />N
<br />185,435.28
<br />17,384.60
<br />168,050.68
<br />PAC0000020 CRUSHER
<br />2/2/1971
<br />N
<br />5,066.67
<br />4,560.00
<br />506.67
<br />PA50000001 PLANTSCREEN
<br />11/5/2001
<br />N
<br />48,295.44
<br />37,211.44
<br />11,084.00
<br />PBF0000002 CONVEYOR BELT
<br />2/17/1978
<br />N
<br />10,456.00
<br />10,456.00
<br />-
<br />PBS0000005 CONVEYOR WEIGH BELT
<br />7/22/1980
<br />N
<br />10,787.63
<br />10,787.63
<br />-
<br />PCA0000017 CONVEYOR
<br />3/29/1980
<br />N
<br />14,350.00
<br />14,350.00
<br />-
<br />PCA0000021 CONVEYOR BELT
<br />3/19/1975
<br />N
<br />12,115.43
<br />11,173.32
<br />942.11
<br />PCA0000022 CONVEYOR
<br />8/31/1978
<br />N
<br />19,400.42
<br />19,400.42
<br />-
<br />PCA0000023 CONVEYOR
<br />8/31/1978
<br />N
<br />19,400.42
<br />19,400.42
<br />-
<br />PCA0000036 CONVEYOR
<br />2/17/1978
<br />N
<br />10,456.00
<br />10,456.00
<br />-
<br />PCA0000063 CONVEYOR
<br />3/28/1975
<br />N
<br />15,485,23
<br />14,281.08
<br />1,204.15
<br />PCC0000020 CONVEYOR
<br />3/29/1980
<br />N
<br />14,350.00
<br />14,350.00
<br />-
<br />PCM0000018 COMPRESSOR AIR 185
<br />6/21/2017
<br />U
<br />13,684.60
<br />12,384.60
<br />1,300.00
<br />PCR0000011 CRUSHER
<br />10/24/1976
<br />N
<br />13,000.00
<br />13,000.00
<br />-
<br />PF84000001 COMPACTOR VIBR GRADE 84"" C
<br />12/15/2017
<br />N
<br />59,387.82
<br />35,632.68
<br />23,755.14
<br />PF84000002 COMPACTOR VIBR GRADE 84"" C
<br />12/15/2017
<br />N
<br />67,202.66
<br />40,321.68
<br />26,880.98
<br />PF84000003 2014 CATERPILLAR CP56 84" PADFOOTSOIL COMPACTOR
<br />12/23/2019
<br />U
<br />30,766.91
<br />3,076.68
<br />27,690.23
<br />PF84000004 COMPACTOR VIBR GRADE 84"" C
<br />3/31/2005
<br />U
<br />50,000.00
<br />45,000.00
<br />5,000.00
<br />PN70000001 COMPACTOR PNE TIRED PS300B
<br />3/31/2005
<br />U
<br />36,471.00
<br />32,823.90
<br />3,647.10
<br />PN90000001 COMPACTOR PNE TIRED PT140A
<br />•4/23/1999
<br />U
<br />21,915.11
<br />19,723.60
<br />2,191.51
<br />PN90000002 2013 CATERPILLAR PS150C PNEU COMPACTOR
<br />12/23/2019
<br />U
<br />11,831.48
<br />1,183.16
<br />10,648.32
<br />PN90000003 2013 CATERPILLAR PS150C PNEU COMPACTOR
<br />12/23/2019
<br />U
<br />13,181.98
<br />1,318.20
<br />11,863.78
<br />PN90000004 COMPACTOR PNE TIRED PS150C
<br />8/3/2017
<br />U
<br />689.26
<br />689.26
<br />-
<br />PN90000005 COMPACTOR PNE TIRED PS150
<br />4/19/2018
<br />U
<br />5,595.50
<br />2,797.68
<br />2,797.82
<br />PN90000006 COMPACTOR PNE TIRED 530A
<br />4/1/2006
<br />U
<br />9,000.00
<br />8,100.00
<br />900.00
<br />PN90000007 COMPACTOR PNE TIRED C530
<br />3/31/2005
<br />U
<br />4,375.00
<br />3,937.50
<br />437.50
<br />PN90000008 COMPACTOR PNE TIRED C530A
<br />3/31/2005
<br />U
<br />9,375.00
<br />8,437.50
<br />937.50
<br />PN90000009 COMPACTOR PNE TIRED C530A
<br />3/31/2005
<br />U
<br />3,750.00
<br />3,375.00
<br />375.00
<br />P520000001 PLACER SPREADER
<br />6/17/1992
<br />N
<br />217,149.30
<br />195,434.37
<br />21,714.93
<br />P520000002 PLACERSPREADER
<br />11/5/2001
<br />N
<br />105,753.84
<br />76,032.84
<br />29,721.00
<br />PS20000003 PLACERSPREADER
<br />3/31/2005
<br />U
<br />139,519.38
<br />125,567.45
<br />13,951.93
<br />P520000004 PLACERSPREADER
<br />4/1/2017
<br />N
<br />97,696.35
<br />97,696.35
<br />-
<br />PSC0000002 SAND SCREW
<br />3/2/1979
<br />N
<br />34,500.00
<br />34,500.00
<br />-
<br />PSS0000012 SCREEN AGGREGATE
<br />4/27/1991
<br />N
<br />41,861.41
<br />37,675.27
<br />4,186.14
<br />PT00000009 CONVEYOR
<br />7/27/1966
<br />N
<br />11,778.79
<br />10,862.87
<br />915.92
<br />
|