Rieth-Riley Construction Co., Inc.
<br />Equipment List
<br />3/31/2020
<br />Acquired New or
<br />Asset # Description
<br />Acquisition Date
<br />Used
<br />Cost
<br />Accum Depr
<br />NBV
<br />AP08000002 PAVER BFT TRACK AP655D
<br />12/15/2017
<br />N
<br />140,394.96
<br />140,394.97
<br />(0.01)
<br />AP08000010 PAVER 8 FTTRACK P385B
<br />8/3/2017
<br />N
<br />52,404.15
<br />17,468.16
<br />34,935.99
<br />APOB000015 PAVER 8FTTRACK PF4410
<br />3/27/2009.
<br />U
<br />120,000.00
<br />120,000.00
<br />.
<br />APIOOO0002 PAVER 10FTTRACK RP195
<br />3/31/2010
<br />N
<br />97,189.93
<br />97,189.93
<br />_
<br />AP10000003 PAVER 10FT RUBBER TIRED RP
<br />3/31/2010
<br />N
<br />90,280.00
<br />90,280.00
<br />_
<br />AP10000004 PAVER 10FTTRACK PF5510 RE
<br />6/16/2005
<br />N
<br />332,018.99
<br />332,018.99
<br />-
<br />AP10000005 PAVER 10FTTRACK RP195
<br />4/1/2013
<br />N
<br />69,308.80
<br />69,308.80
<br />_
<br />APIOO00006 PAVER 10FT TRACK AP1055 D
<br />4/15/2009
<br />N
<br />80,273.55
<br />80,273.65
<br />-
<br />AP10000007 PAVER 10FTTRACK AP1055D
<br />4/15/2009
<br />N
<br />72,381.82
<br />72,381.82
<br />_
<br />AP10000008 PAVER 10FTTRACK AP1055D
<br />3/22/2010
<br />N
<br />97,463.40
<br />97,463.40
<br />-
<br />AP10060009 PAVER 1OFiTRACK AP1055D
<br />3/22/2010
<br />N
<br />113,281.63
<br />113,281.63
<br />_
<br />AP10000011 PAVER 10FTTRACK AP108SE
<br />12/15/2017
<br />N
<br />146,701.93
<br />146,701.94
<br />(0.01)
<br />AP10000012 PAVER 1OFTTRACK AP1055E
<br />12/15/2017
<br />N
<br />147,561.81
<br />147,561.82
<br />(0.01)
<br />AP10000013 PAVER 10FTTRACK AP1055E
<br />12/15/2017
<br />N
<br />147,212.99
<br />147,213.00
<br />(0.01)
<br />AP10000014 PAVER IOFTTRACK AP1055E
<br />12/15/2017
<br />N
<br />147,124.45
<br />147,124.46
<br />(0,01)
<br />APICOOOO15 PAVER 10FTTRACK AP1055E
<br />12/15/2017
<br />N
<br />152,557.33
<br />152,557.34
<br />(0.01)
<br />APIOOCO016 PAVER 10FTTRACK AP1055E
<br />12/15/2017
<br />N
<br />153,996.55
<br />153,996.56
<br />(0:01)
<br />APIO000020 PAVER 10FTTRACK 5200-21
<br />4/1/2015
<br />N
<br />420,980.00
<br />236,801.33
<br />184,178.67
<br />AP10000043 PAVER 10FTTRACK PF5510
<br />3/17/2009
<br />U
<br />125,000.00
<br />125,000.00
<br />_
<br />AP10000044 PAVER 10FTTRACK PF5510
<br />3/17/2009
<br />U
<br />30,000.00
<br />30,000.00
<br />_
<br />APC0000o01 PAVER CURB ASPHALT
<br />4/1/2006
<br />U
<br />1,000.00
<br />900.00
<br />100.00
<br />APTOOCO001 PAVER PULLTYPE H500B
<br />4/4/1988
<br />N
<br />12,895.37
<br />11,605.83
<br />1,289.54
<br />ATT7713 ATTACHMENT BED WATER/FUEL
<br />4/9/2008
<br />N
<br />55,704.62
<br />55,704.62
<br />_
<br />BKT1000001 ATTACHMENT BUCKET
<br />9/6/1995
<br />N
<br />6,983.55
<br />6,285.19
<br />698.36
<br />BKTI000002 ATTACHMENT BUCKET
<br />7/18/1995
<br />N
<br />5,856.90
<br />5,271.21
<br />585.69
<br />BL15000001 LOADER BACKHOE 4201`2
<br />4/19/2018
<br />U
<br />51,039.15
<br />16,332.55
<br />34,706.60
<br />BL15000002 LOADER BACKHOE 420F2
<br />4/19/2018
<br />U
<br />51,073.93
<br />16,343.64
<br />34,730.29
<br />BL15000003 LOADER BACKHOE 420 W/FORKS
<br />4/19/2018
<br />U
<br />30,529.85
<br />8,359.44
<br />22,170.41
<br />BLISOO0004 2018 CATERPILLAR 4201`2 LOADER BACKHOE
<br />8/30/2019
<br />N
<br />5,500.00
<br />1,222.24
<br />4,277.76
<br />BL15000005 2018 CATERPILLAR 4201`2 LOADER BACKHOE
<br />12/19/2019
<br />N
<br />24,175.26
<br />2,686.16
<br />21,489.10
<br />BM60000001 LIFT BOOM 60'
<br />7/1/2016
<br />U
<br />4,393.00
<br />3,953.70
<br />439.30
<br />C185000003 COMPRESSOR AIR 185
<br />4/1/2000
<br />U
<br />2,300.00
<br />2,100.00
<br />200.00
<br />0185000005 COMPRESSORAIR
<br />4/1/2006
<br />U
<br />1,000.00
<br />1,000.00
<br />CBRK000001 BREAKER CONCRETE
<br />2/25/2002
<br />N
<br />41,825.75
<br />37,943.37
<br />3,882.38
<br />CBRK000002 BREAKER CONCRETE
<br />4/26/2002
<br />N
<br />58,275.00
<br />52,447.50
<br />5,827.50
<br />CPSOOO0002 COLD PLANER ROTOMILL
<br />4/1/2013
<br />N
<br />98,142.54
<br />88,328.29
<br />9,814.25
<br />CRB0000001 PAVER CU RB & GUTTER GT6300
<br />4/10/1997
<br />N
<br />151,320.00
<br />136,188.00
<br />15,132.00
<br />CRB0000002 PAVER CURB & GUTTER GT3600
<br />7/20/2000
<br />N
<br />159,280.40
<br />143,352.36
<br />15,928.04
<br />CRB0000003 PAVER CURB & GUTTER GT3600
<br />4/23/2001
<br />N
<br />129,617.55
<br />116,655.79
<br />12,961.76
<br />'CRB0000004 PAVER CURB & GUTTER GT3600
<br />4/1/2002
<br />N
<br />130,480.46
<br />117,432.41
<br />13,048.05
<br />CRB0000005 PAVER CURB & GUTTER TP880
<br />7/3%2011
<br />N
<br />60,660.00
<br />40,440.00
<br />20,220.00
<br />CRB0000006 PAVER CURB & GUTTER GT3600
<br />4/30/1997
<br />U
<br />127,000.00
<br />122,300.00
<br />4,700.00
<br />CRB0000007 PAVER CURB & GUTTER GT3600
<br />8/1/2016
<br />U
<br />65,000.00
<br />65,000.00
<br />.
<br />CRB0000008 2017 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVER
<br />4/1/2017
<br />N
<br />339,551.66
<br />127,332.00
<br />212,219.66
<br />CRB0000009 2018 POWER CURBER 5700-CMAX CURB & GUTTER CONCRETE PAVER
<br />4/1/2018
<br />N
<br />463,440.54
<br />115,860.24
<br />_
<br />347,580,30
<br />CRB0000010 2019 POWER CURBER 5700-C CURB & GUTTER CONCRETE PAVER
<br />4/1/2019
<br />N
<br />345,524.40
<br />43,190.52
<br />302,333.88
<br />CSP0000001 SPREADER CHIP
<br />7/21/1977
<br />N
<br />34,121.36
<br />34,121.36
<br />-
<br />CSP0000002 SPREADER CHIP
<br />4/1/2018
<br />U
<br />108,123.50
<br />54,061.68
<br />54,061.82
<br />CST3000001 COMPACTOR STATIC C330A
<br />12/10/1987
<br />N
<br />29,744.00
<br />26,769.60
<br />2,974.40
<br />CST3000002 COMPACTOR STATIC C330A
<br />12/10/1987
<br />N
<br />29,744.00
<br />26,769.60
<br />2,974.40
<br />CST3000003 COMPACTOR STATIC C3308
<br />8/23/1988
<br />N
<br />28,860.00
<br />25,974.00
<br />2,886.00
<br />CST3000004 COMPACTOR STATIC C330B
<br />8/23/1988
<br />N
<br />28,860.00
<br />25,974.00
<br />2,886.00
<br />CST3000005 COMPACTOR STATIC C330B
<br />4/30/2009
<br />U
<br />3,000.00
<br />3,000.00
<br />-
<br />CST3000006 COMPACTOR STATIC C330B
<br />4/30/2009
<br />U
<br />3,000.00
<br />3,000.00
<br />_
<br />CST3000007 COMPACTOR STATIC C330B
<br />4/30/2009
<br />U
<br />3,000.00
<br />3,000.00
<br />_
<br />CST3000008 COMPACTOR STATIC BWSAS
<br />3/31/2005
<br />U
<br />5,000.00
<br />5,000.00
<br />_
<br />CST3000009 COMPACTOR STATIC C330A
<br />3/31/2005
<br />U
<br />2,500.00
<br />2,250.00
<br />250.00
<br />CWKT100001 ATTACHMENTTIE BAR INSERTE
<br />4/1/2004
<br />N
<br />61,340.66
<br />55,206.59
<br />6,134.07
<br />CWKT110001 ATTACHMENT BURLAP DRAG W/6
<br />5/18/2001
<br />N
<br />13,604.30
<br />12,243.87
<br />1,360.43
<br />CWKT300001 ATTACHMENT CONV GOMACO W/6
<br />r6/311997
<br />N
<br />22,745.00
<br />20,470.50
<br />2,274.50
<br />CWKT400001 ATTACHMENTEXTEN51ON W/537
<br />7/22/1994
<br />N
<br />3,870.03
<br />3,483.03
<br />387.00
<br />CWKT500001 FINISHER FINAL BIDWELL W/5
<br />8/15/1994
<br />N
<br />28,432.50
<br />25,589.25
<br />2,843.25
<br />CWKT500002 FINISHER FINAL BIDWELL W/5
<br />2/10/1995
<br />N
<br />30,460.00
<br />27,414.00
<br />3,046.00
<br />CWKT500003 PAN HYDRAULIC VIBRATOR W/S
<br />6/14/2001
<br />N
<br />3,591.31
<br />3,232.18
<br />359.13
<br />CWKT600002 MOLD CURB W/6894
<br />3/22/2000
<br />N
<br />15,312.00
<br />13,780.80
<br />1,531.20
<br />CWKT600003 MOLD PARAPET W/6136
<br />5/20/2001
<br />N
<br />22,415.00
<br />20,173.50
<br />2,241.50
<br />CWKT600004 MOLD CURB 31 IN F/6894 PAV
<br />8/4/2003
<br />N
<br />5,942.52
<br />5,348.26
<br />594.26
<br />D080000001 DOZER 70 HP FD5 LT
<br />7/1/2016
<br />U
<br />6,000.00
<br />5,400.00
<br />600,00
<br />D090000001 DOZER 85 HP D4K XL
<br />4/28/2016
<br />N
<br />121,771.74
<br />54,797.28
<br />66,974.46
<br />D090000002 DOZER 90 HP D5G
<br />3/16/2009
<br />U
<br />38,000.00
<br />34,200.00
<br />3,800.00
<br />D105000001 DOZER 100 HP D5K2 LGP
<br />12/15/2017
<br />N
<br />45,651.61
<br />27,391.00
<br />18,260.61
<br />DIOSO00003 DOZER 100 HP D5K2 LGP
<br />12/15/2017
<br />N
<br />45,652.93
<br />27,391.84
<br />18,261.09
<br />D105000004 DOZER 100 HP D5K LGP
<br />3/18/2013
<br />U
<br />70,860.00
<br />55,802.16
<br />15,057.84
<br />D105000005 DOZER 100 HP D5K.LGP
<br />3/18/2013
<br />U
<br />83,580.00
<br />65,819.16
<br />17,760.84
<br />D105000006 2014 CATERPILLAR D5K2 LGP DOZER
<br />12/23/2019
<br />N
<br />23,433.56
<br />2,343.36
<br />21,090.20
<br />D105000007 DOZER 100 HP D5K LGP
<br />4/1/2017
<br />U
<br />106,713.64
<br />41,160.96
<br />65,552.68
<br />D105000008 DOZER 100 HP D5K2 LGP
<br />4/1/2017
<br />U
<br />103,010.60
<br />39,732.72
<br />63,277.88
<br />
|