My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/1905 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1905
>
06/1905 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:22:43 PM
Creation date
5/28/2021 2:50:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/1/1905
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tuesd <br />1905. <br />227 <br />The Board met in regular session at 10 A. Tit. Mr.'McInerny absent. <br />Bond of John Siders & Co filed and approved for the Portage avenue grading. Contract <br />signed for same. <br />Remonstrance filed against the Main and Michigan street sprinkling. <br />��ctric �Zee" <br />Acting Preside -it. <br />TUESDAY EVENING JUNE 13Th, 1905. SPECIAL SESSION AT 7:15 P. M. <br />The Board net in Special Session at 7:15 P. M. Mr. McInerny absent. <br />Hearing given on Declaratory Resolutions for the following improvements, to -wit; - <br />Grade, Curb & Walk on Marion Boulevard,Grade, Curb & Walk on'N. Eddy street from South <br />Bend avenue to -St. Vincent Street, Walks on Johnson street from Bertrand street to <br />Longley avenue, Pipe Sewer on Harrison avenue from Michigan avenue to Freubringer street. <br />All under Improvement Resolutions Nos. 268, 2692 270 & 272 respectively. <br />In`the above matter No remonstrators appeared and no remonstrances were filed. The <br />Board therefore find in each and every case in said improvements that the benefits to the <br />Property and to the City of.South Bend are equal to the estimated cost of said improvement <br />and the same are hereby in all things ratified, confirmed and approved. <br />Engineer filed his estimated cost of the improvements as follows; - <br />Marion Boulevard Grade, Curb & Walk A 743.00 <br />N. Eddy street Grade, Curb & Welk 2101.00 <br />Johnson street walks 452.00 <br />Harrison avenue Pipe Sewer- 1100.00 <br />Hearing on Scott & Lindsey street Pipe Sewer, Tutt Street Pipe Sewer and Foote <br />street Grade, Curb, Walk and Macadam, deferred until Friday June 16th, 1905 at 10 a. m. <br />Acting President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.