Laserfiche WebLink
220 <br />sd <br />The Board met in regular session at 10 A. M. All members present. <br />Petition filed for Pipe Sewer on Oak street from Cushing street to Cottage <br />Grove avenue. Referred to the Engineer for specifications. <br />Petition filed for the establishment of grade on Vernon street and. on Leer <br />street in U'Im. Rupel's 1st addition. Referred to the Engineer. <br />Remonstrance filed against the proposed Pipe Sewer on Oak street from Cushing <br />street to Scott street. <br />Bids were received and r6ferred to the Engineer for tabulation for the following <br />improvements, -to -wit; <br />Grade & Curb on Marietta street, Cement walks on Florence avenue, <br />Curb & Walk on Frances street, Curb & Talk on Quimby street, Grade, Curb & Walk on_ <br />Fisher street, Curb & Walk on Wayne street and Cement walk on Eddy street and Grade on <br />Portage avenue. <br />Plat of Kaley's 3rd Addition to South Bend filed. <br />Contractor Bond of Harrison A. Powell filed. <br />Contract entered into with R. Z. Snell for the completion of the Fassnacht <br />Avenue Trunk Sewer by plastering the inside of the same. <br />-President. <br />