Laserfiche WebLink
Initiate installation, by placing chalk line on pavement to determine cushion and/or table placement. <br />Starting with a corner module, insert Secure-Loc dual flange connectors <br />into slots located in the module underside and place it atop pavement <br />adjoining chalk line. <br /> <br />Select the opposite corner module, insert one Secure-Loc <br />Dual Flange connector into slot located in the module under- <br />side so it will align with the initial corner module when set <br />together. Place this module on pavement and interlock the <br />two modules. <br />This will form <br />one side of <br />the Cushion <br />and/or Table <br /> SS Lag Bolts, Washers, Barbed Anchors, Rubber <br />Bolt Caps and Two-Part Adhesive are supplied <br />with each cushion. The two-part resin Applicator <br />Gun as shown, is available as an option. <br />Begin drilling as shown. Drill holes to a <br />depth of 10” from module surface <br />(7” into the pavement). Thorough- <br />ly blow out holes with compressed <br />air. Assemble the Lag Bolts, <br />Washers and Anchors as shown <br />Connect the static mixer to the adhe- <br />sive tube and insert into the Resin Gun. <br />Prime the Applicator Resin Gun until <br />the resin at the tip is gray. Insert the <br />mixer into the hole and apply the adhe- <br />sive (Generally 2 pumps). Warning: <br />The resin will harden in 15 minutes or <br />less. <br />Immediately insert and pound the <br />anchor/bolt/washer combo into the hole <br />until the lip of the anchor is at pave- <br />ment level. Tighten the bolt with the <br />impact wrench ensuring the washer is <br />firmly seated. DO NOT over tighten. <br />Insert the rubber bolt caps in each hole <br />1 <br />1 <br />2 <br />2 <br />3 <br />3 <br />4 <br />4 <br />TOOL REQUIREMENTS: <br />9/16” masonry bit (Preferably 18” long) <br />Heavy duty hammer drill <br />Long nose air nozzle (or vacuum) <br />Impact wrench <br />Resin Applicator Gun for adhesive <br />Using the same connector insertion technique, continue with <br />other two center modules and then a third corner module. It <br />will should look like the photo shown below. <br />Re-check module alignment and pavement position. Now add <br />the final row of center modules, then the last corner. Once all <br />modules are connected, you are now ready to bolt cushion to <br />the pavement <br />Take a center module and insert <br />two Secure-Loc connectors. Place <br />this module aligning with your <br />chalk line and abutting the side of <br />the initial corner module and <br />interlock the two modules. The <br />cushion should take on the <br />appearance of a large “L”. <br />RFP-Install-042321 <br />ALL RIGHTS RESERVED 75 Michigan St. Lockport, NY 14094 Phone: 716.478.0404 <br />Fax: 716.478.0408 www.rubberform.com sales@rubberform.com <br />INSTALLATION INSTRUCTIONS <br />Speed Cushions, Tables, & Humps