Laserfiche WebLink
BID TABULATION <br />2021 Community Crossings Round 1 <br />Project No: 121-014 <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost <br />1 Maintenance of Traffic 1 LS $13,938.00 $13,938.00 $6,250.00 $6,250.00 $4,000 $4,000.00 <br />2 Mobilization and Demobilization 1 LS $19,912.00 $19,912.00 $7,300.00 $7,300.00 $3,000.00 $3,000.00 <br />3 Milling, Up to 3"9180 SY $4.00 $36,720.00 $2.50 $22,950.00 $2.31 $21,205.80 <br />4 HMA Surface, 9.5 mm – Type B 1510 TONS $70.00 $105,700.00 $69.00 $104,190.00 $80.00 $120,800.00 <br />5 HMA Wedge and Leveling – Type B 76 TONS $60.00 $4,560.00 $69.00 $5,244.00 $80.00 $6,080.00 <br />6 HMA for Patching 67 TONS $120.00 $8,040.00 $130.00 $8,710.00 $180.00 $12,060.00 <br />7 Tack Coat 6 TONS $1.00 $6.00 $1.00 $6.00 $1.00 $6.00 <br />8 Joint Adhesive, Surface 2680 LF $0.60 $1,608.00 $1.00 $2,680.00 $0.77 $2,063.60 <br />9 Adjust Manhole to Grade 14 EA $450.00 $6,300.00 $250.00 $3,500.00 $90.00 $1,260.00 <br />10 Adjust Water Valve Structure to Grade 6 EA $80.00 $480.00 $85.00 $510.00 $50.00 $300.00 <br />11 Adjust Inlet to Grade 24 EA $110.00 $2,640.00 $250.00 $6,000.00 $90.00 $2,160.00 <br />12 Concrete Curb Ramp, Removal 132 SY $50.00 $6,600.00 $35.00 $4,620.00 $50.00 $6,600.00 <br />13 Concrete Curb Ramp, Installation 132 SY $200.00 $26,400.00 $170.00 $22,440.00 $177.00 $23,364.00 <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost <br />1 Maintenance of Traffic 1 LS $12,256.00 $12,256.00 $6,172.00 $6,172.00 $4,000 $4,000.00 <br />2 Mobilization and Demobilization 1 LS $17,509.00 $17,509.00 $7,100.00 $7,100.00 $3,000.00 $3,000.00 <br />3 Milling, Up to 3"6480 SY $4.00 $25,920.00 $2.85 $18,468.00 $2.31 $14,968.80 <br />4 HMA Surface, 9.5 mm – Type B 1070 TONS $70.00 $74,900.00 $69.00 $73,830.00 $80.00 $85,600.00 <br />5 HMA Wedge and Leveling – Type B 54 TONS $60.00 $3,240.00 $69.00 $3,726.00 $80.00 $4,320.00 <br />6 HMA for Patching 35 TONS $120.00 $4,200.00 $160.00 $5,600.00 $180.00 $6,300.00 <br />7 Tack Coat 4 TONS $1.00 $4.00 $1.00 $4.00 $1.00 $4.00 <br />8 Joint Adhesive, Surface 1960 LF $0.60 $1,176.00 $1.00 $1,960.00 $0.77 $1,509.20 <br />9 Adjust Manhole to Grade 9 EA $450.00 $4,050.00 $250.00 $2,250.00 $90.00 $810.00 <br />10 Adjust Water Valve Structure to Grade 8 EA $80.00 $640.00 $85.00 $680.00 $50.00 $400.00 <br />11 Adjust Inlet to Grade 7 EA $110.00 $770.00 $250.00 $1,750.00 $90.00 $630.00 <br />12 Concrete Curb Ramp, Removal 258 SY $50.00 $12,900.00 $30.00 $7,740.00 $50.00 $12,900.00 <br />13 Concrete Curb Ramp, Installation 258 SY $200.00 $51,600.00 $140.00 $36,120.00 $177.00 $45,666.00 <br />Total All Divisions <br />I hereby certify that the above truly and accurately represents bids received for this project on May 17, 2021 <br />Leslie Biek, PE, Assistant City Engineer <br />Division 6: Woodmont Dr from Ridgedale Rd to Brookmeade Dr Engineer's Estimate Milestone Rieth Riley <br />DIVISION 6 TOTAL $209,165.00 $165,400.00 $180,108.00 <br />DIVISION 5 TOTAL $232,904.00 $194,400.00 $202,899.40 <br />Division 5: Altgeld St from York Rd to Ironwood Dr Engineer's Estimate Milestone Rieth Riley <br />YNon-Collusion Affadavit Y <br />$1,595,266.80 $1,299,800.00 $1,368,995.90 <br />S:\Public Works\Projects\Projects by Year\2021 Projects\121-014 2021 CCMG - 1\1 - Admin\1 - BPW Documents\Bid Tabulation