My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rejection of Quotations - 2021 Crack Sealing Proj No. 121-020
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Reject Bids/Quotes/Proposals
>
Rejection of Quotations - 2021 Crack Sealing Proj No. 121-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2021 1:16:40 PM
Creation date
5/25/2021 1:16:06 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/25/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 2/14/2020 Page - 6 Public Works Quote <br />Street Name From To LN MI <br />Lincoln Way West Lawndale Chapin 2.88 <br />Edison South Bend Ironwood 1.64 <br />Edison Ironwood Hickory 4.02 <br />Ironwood Mishawaka McKinley 1.84 <br />Michigan Ewing Sample 4.64 <br />Ireland York Ironwood 2.22 <br />Mayflower Belleville Sample 1.39 <br />Colfax William Main 0.77 <br />LaSalle Lafayette Michigan 0.70 <br /> <br />3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br /> <br /> <br />XVIII. CRACK SEALING AND FILLING <br /> <br />A. Prevailing Specifications: 2020, INDOT Standard Specifications Section 408, 902, 906 <br />B. Additions: <br /> <br />1. Transverse reflective cracks spanning full lane width shall be sealed. All other cracks shall be filled. <br />2. Sealing and filling operations shall not be conducted on a wet surface or when the ambient <br />temperature is below 40 degrees Fahrenheit, or when other unsuitable conditions exist, unless <br />approved by the Engineer. <br />3. Before sealing or filling, cracks shall be cleaned by blowing with compressed air. Airflow shall have <br />a minimum pressure of 100 psi and maximum pressure of 150 psi. <br />4. Cracks shall be free of dirt, debris, dust, and moisture before sealing or filling. <br />5. The Contractor may use a hot air lance to clean and dry wet cracks before sealant application in <br />order to continue working in wet conditions. <br />6. Crack Sealing: <br />a. Work shall not be performed when ambient temperature is below 40°F. <br />b. ASTM D 6990 Type II sealant shall be used for sealing cracks. <br />c. Cracks shall be sealed with hot poured joint sealant to within 1/4 in. below the surface in <br />accordance with the manufacturer’s recommendations. <br />7. Crack Filling <br />a. Cracks shall be filled completely and flush or overbanded with AE-90S. Overbands must not <br />exceed ¼ in. in thickness or 5 in. in width. <br />8. All excess asphalt material shall be removed from the pavement. <br />9. Asphalt materials shall not be applied in such a way that existing pavement markings are covered. <br />10. Sealants and fillings shall cure for one hour before street is opened to traffic or fine aggregate must <br />be applied to cover filled cracks to minimize tracking. Any excess cover material shall be removed <br />from pavement within 24 hours when directed. <br />11. Measurement and Payment: <br />a. The cost of all materials, routing, cleaning, and any necessary incidentals shall be included in <br />the pay items specified in the proposal: <br />Cracks in Asphalt Pavement, Fill …………….....…TON <br />Cracks in Asphalt Pavement, Seal…………………TON <br />
The URL can be used to link to this page
Your browser does not support the video tag.