My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Wastewater Treatment Plant Final Clarifiers 4-5 - Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Change Orders
>
Change Order No 1 - Wastewater Treatment Plant Final Clarifiers 4-5 - Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 1:29:15 PM
Creation date
5/20/2021 1:29:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/11/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bowen Labor <br />Classification Rate/HR Hours Cost <br />Carpenter 72.66$ 64 4,650.24$ <br />Carpenter Foreman 80.17$ 16 1,282.72$ <br />Supervision LS 24 2,520.00$ <br />Bowen Equipment <br />Classification Rate/Day Days Cost <br />Manlift 225 10 2,250.00$ <br />Total Labor/Equipment Cost 10,702.96$ <br />Bowen Material <br />Classification Rate/Unit Units Needed Cost <br />Sikadur 32 410 4 1,640.00$ <br />Delta Subcontractor <br />Classification Rate/Unit Units Needed Cost <br />Labor LS 23490 23,490.00$ <br />Equipment LS 2960 2,960.00$ <br />Material LS 900 900.00$ <br />Total Material/Sub Cost 28,990.00$
The URL can be used to link to this page
Your browser does not support the video tag.