Page 7 of 12 <br />1/21 <br />during project implementation as well as after achieving full operation of the charging <br />equipment. This report shall be due within ten (10) business days of IDEM request. <br /> <br />These progress reports will include, but are not limited to the following: <br /> <br />1. VW Project Funding Agreement number. <br />2. Physical location of electric vehicle charging equipment. <br />3. Completion status of project (i.e. 0% complete, 25% complete, 50% complete, <br />100% complete). <br />4. Electronic images of project location and charging equipment during <br />implementation. <br /> <br />Task D: Usage Data Reports <br /> These usage data reports will include, but are not limited to the following: <br />1. Number of charging events. <br />2. Connect and disconnect times. <br />3. Start and end charge times. <br />4. Number of unique vehicles connected. <br />5. Total kWh dispensed per charging event. <br />6. Average kWh per charging event. <br />7. Peak power (kW) per event. <br />8. Peak power (kW) demand (kW) by month. <br />9. Average duration of charging events. <br />5. Percentage of station downtime. <br /> <br /> Task E: Final Report <br /> <br />The Grantee shall submit a Final Report covering the successes and failures of this program <br />ten (10) business days before the expiration of this Agreement. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />THE REST OF THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK. <br />