Laserfiche WebLink
BID TABULATION <br />2021 Street and Sewer Material Bid <br />Project No: 121-018 <br />For Bids Due: April 13, 2021 <br />DIVISION A - PCC MATERIALS <br />Item No. Description Quantity Unit Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price <br />A-1 Class A Concrete 2500 CY -$ -$ -$ -$ 115.00$ -$ 116.00$ <br />A-2 Class A High Early 800 CY -$ -$ -$ -$ 125.00$ -$ 126.00$ <br />A-3 7 Bag Mix - New City Specs 600 CY -$ -$ -$ -$ 138.00$ -$ 138.00$ <br />A-4 High Early Concrete w/ Integral Color - Black 350 CY -$ -$ -$ -$ 215.00$ -$ 216.00$ <br />A-5 Flowable Fill, Removable 350 CY -$ -$ -$ -$ 78.00$ -$ 80.00$ <br />A-6 Non-Chloride Accelerator added to concrete – 0.5% 325 EA CY -$ -$ -$ -$ 2.75$ -$ 2.75$ <br />A-7 Non-Chloride Accelerator added to concrete – 1% 1000 EA CY -$ -$ -$ -$ 5.50$ -$ 5.50$ <br />A-8 Non-Chloride Accelerator added to concrete – 2% 2100 EA CY -$ -$ -$ -$ 11.00$ -$ 11.00$ <br />DIVISION B - AGGREGATE MATERIALS <br />Item No. Description Quantity Unit Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price <br />B-1 No. 23 Sand 5000 TON -$ -$ 11.25$ 15.00$ 16.35$ 12.00$ -$ <br />B-2 No. 53 Gravel 1000 TON -$ -$ 14.25$ 16.00$ 23.50$ -$ -$ <br />B-3 No. 53 Recycled Concrete 7500 TON -$ -$ 14.25$ 15.00$ 13.85$ 15.00$ -$ <br />B-4 No. 53 Slag 1000 TON -$ -$ 15.50$ 20.00$ 19.25$ 18.00$ -$ <br />B-5 Topsoil 500 CY -$ -$ -$ 25.00$ -$ -$ -$ <br />B-6 No. 11 Slag Chip Stone 1000 TON -$ -$ 18.25$ 28.00$ 20.85$ 21.25$ -$ <br />DIVISION C - SEWER MATERIALS CASTINGS <br />Item No. Description Quantity Unit Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price <br />C-1 Manhole Cover and Frame: EJ 1040A or Neenah R-1642 (Circle One) 300 EA -$ 320.25$ -$ -$ -$ -$ -$ <br />C-2 Catch Basin Cover & Frame: EJ 1020-M1 or Neenah R-1642 (Circle One) 300 EA -$ 282.35$ -$ -$ -$ -$ -$ <br />DIVISION D - SEWER MATERIALS <br />Item No. Description Quantity Unit Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price <br />D-1 MH Riser 20 3/4” D – 1”R – 7/8”L 40 EA 90.50$ -$ -$ -$ -$ -$ -$ <br />D-2 MH Riser 20 3/4” D – 1 1/2”R – 7/8”L 40 EA 96.75$ -$ -$ -$ -$ -$ -$ <br />D-3 MH Riser 20 3/4” D – 2”R – 7/8”L 20 EA 103.00$ -$ -$ -$ -$ -$ -$ <br />D-4 MH Riser 20 3/4” D – 2 1/2”R – 7/8”L 10 EA 110.25$ -$ -$ -$ -$ -$ -$ <br />D-5 MH Riser 21 3/4” D – 1”R – 1 3/8”L 20 EA 135.50$ -$ -$ -$ -$ -$ -$ <br />D-6 MH Riser 21 3/4” D – 1 1/2”R – 1 3/8”L 30 EA 141.75$ -$ -$ -$ -$ -$ -$ <br />D-7 MH Riser 21 3/4” D – 2”R – 1 3/8”L 30 EA 148.00$ -$ -$ -$ -$ -$ -$ <br />D-8 MH Riser 22 1/8” D – 2”R – 1 1/4”L 20 EA 103.00$ -$ -$ -$ -$ -$ -$ <br />D-9 MH Riser 22 1/8” D – 3”R – 1 1/4”L 5 EA 120.50$ -$ -$ -$ -$ -$ -$ <br />D-10 MH Riser 22 1/4” D – 1”R – 1 1/2”L 30 EA 90.50$ -$ -$ -$ -$ -$ -$ <br />American <br />Highway <br />Products <br />Ferguson <br />Waterworks <br />Klink <br />Trucking <br />Milestone <br />Contractors <br />North, Inc. <br />Ozinga Ready <br />Mix Concrete, <br />Inc. <br />American <br />Highway <br />Products <br />Ferguson <br />Waterworks <br />Klink <br />Trucking <br />Milestone <br />Contractors <br />North, Inc. <br />Ozinga Ready <br />Mix Concrete, <br />Inc. <br />American <br />Highway <br />Products <br />Ferguson <br />Waterworks <br />Klink <br />Trucking <br />Milestone <br />Contractors <br />North, Inc. <br />Ozinga Ready <br />Mix Concrete, <br />Inc. <br />Smith <br />Ready Mix <br />Smith <br />Ready Mix <br />Ozinga Ready <br />Mix Concrete, <br />Inc. <br />Smith <br />Ready Mix <br />Smith <br />Ready Mix <br />Rieth-Riley <br />Construction <br />Co., Inc. <br />Rieth-Riley <br />Construction <br />Co., Inc. <br />Rieth-Riley <br />Construction <br />Co., Inc. <br />Rieth-Riley <br />Construction <br />Co., Inc. <br />American <br />Highway <br />Products <br />Ferguson <br />Waterworks <br />Klink <br />Trucking <br />Milestone <br />Contractors <br />North, Inc. <br />Page 1 of 2