Laserfiche WebLink
Rieth-Riley Construction Co., Inc. <br />Equipment List <br />3/31/2020 <br />Acquired New or <br />Asset 9 Description <br />Acquisition Date <br />Used <br />Cost <br />Accum Depr <br />NBV <br />PDS0000003 TANK FUEL <br />3/6/1980 <br />N <br />70,884.32 <br />63,795,89 <br />7,088,43 <br />PD50000004 TANK FUEL <br />4/26/1997 <br />N <br />13,846.22 <br />12,461.60 <br />1,384.62 <br />PDS0000005 TANK FUEL (3) <br />4/29/2006 <br />N <br />121,014.71 <br />121,014.71 <br />PDS0000006 TANK CALIBRATION <br />4/1/2003 <br />N <br />47,214.00 <br />42,492.60 <br />4,721.40 <br />PD50000007 BURNER <br />3/3/2012 <br />U <br />22,484.00 <br />10,192,32 <br />11,691,68 <br />PD50000008 BURNER <br />7/21/2007 <br />N <br />116,301.93 <br />60,089,16 <br />56,212.77 <br />PD50000009 BURNER <br />4/18/2009 <br />N <br />89,000.00 <br />89,000,00 <br />PDS0000010 TANK FUEL <br />4/1/1997 <br />N <br />54,303.74 <br />48,873.37 <br />5,430,37 <br />PDS0060011 BURNER <br />7/2/2016 <br />N <br />107,623.00 <br />41,131.84 <br />66,491.16 <br />PDS0Q00012 TANK FUEL <br />4/14/1970 <br />N <br />1,315.60 <br />1,213.30 <br />102.30 <br />PDS0000013 TANK CALIBRATION <br />2/25/2000 <br />N <br />21,293.83 <br />18,866.72 <br />2,427.11 <br />P050000014 TANK FUEL <br />3/28/2014 <br />N <br />18,449.87 <br />15,940.68 <br />2,509,19 <br />PDS0000015 TANKCALIBRATION <br />3/28/2014 <br />N <br />4,829.92 <br />4,173.12 <br />656.80 <br />PD50000016 BURNER <br />5/3/2014 <br />N <br />103,000,00 <br />41,143.08 <br />61,856,92 <br />PDS0000017 BURNER DRUM <br />3/16/2009 <br />U <br />25,000,00 <br />16,500.00 <br />8,500,00 <br />POS0000018 TANK CALIBRATION <br />3/16/2009 <br />U <br />8,000.00 <br />5,280.00 <br />2,720,00 <br />PD50000019 TANK FUEL <br />3/16/2009 <br />U <br />].8,000.00 <br />11,880,00 <br />6,120.00 <br />PDS0000020 BURNER <br />5/7/1994 <br />N <br />33,611.47 <br />30,250.32 <br />3,361.15 <br />PDS0000021 TANK FUEL <br />5/2/1998 <br />N <br />33,448.30 <br />30,103.47 <br />3,344,83 <br />PD50000022 TANK FUEL <br />6/1/1979 <br />N <br />3,842.00 <br />3,457,80 <br />384.20 <br />PDS0000023 BURNER NATURAL GAS <br />4/15/2017 <br />N <br />150,499,42 <br />45,149.76 <br />105,349.66 <br />PD50000024 TANK CALIBRATION <br />3/16/2009 <br />U <br />8,000,00 <br />5,280.00 <br />2,720,00 <br />PDS0000025 TANK FUEL <br />9/21/1999 <br />U <br />42,215.47 <br />37,993.92 <br />4,221,55 <br />PDS0000026 TANK FUEL <br />8/9/2005 <br />U <br />20,726,23 <br />20,726.23 <br />PDS0000027 TANK CALIBRATION <br />3/16/2009 <br />U <br />8,000.00 <br />5,280.00 <br />2,720,00 <br />PDS0000028 BURNER <br />3/16/2009 <br />U <br />15,300.00 <br />10,098,00 <br />5,202.00 <br />PDS0000029 TANK RUO <br />3/31/2005 <br />U <br />10,000.00 <br />8,500.00 <br />11500,00 <br />PDS0060030 TANK RUO <br />3/31/2005 <br />U <br />19,325.00 <br />16,426.25 <br />2,898,75 <br />PD50000031 TANK RUO/TACK <br />3/31/2005 <br />U <br />10,000.00 <br />8,500.00 <br />1,500,00 <br />PDS0000032 BURNER <br />3/31/2005 <br />U <br />9,780.00 <br />8,802.00 <br />978.00 <br />PDS0000033 TANK PROPANE <br />3/31/2005 <br />U <br />2,950.00 <br />2,655.00 <br />295.00 <br />PDS0000034 TANK BURNER FUEL <br />6/18/1979 <br />N <br />60,630,25 <br />54,567.22 <br />6,063,03 <br />PDS0000035 TANK BURNER FUEL <br />4/1/1992 <br />N <br />19,606.52 <br />17,645,87 <br />1,960,65 <br />PDS0000036 TANK FUEL <br />5/2/1998 <br />N <br />33,634.85 <br />30,271.36 <br />3,363,49 <br />PD50000037 BURNER DRYER CONV TO NAT'L <br />8/1/2012 <br />N <br />27,353.68 <br />20,971,28 <br />6,382,40 <br />PD50000038 GAS TRAIN&REGULATOR <br />4/1/2009 <br />N <br />17,705.26 <br />17,705.26 <br />PD50000039 CONVERT BURNER TO NATURAL <br />4/1/2009 <br />N <br />15,440.47 <br />15,440.47 <br />PD50000040 BURNER EXTENSION <br />5/2/2015 <br />N <br />10,325.00 <br />10,166.16 <br />158.84 <br />PD50000042 BURNER DRYER CONVTO NAT'L <br />9/2/2012 <br />N <br />47,235.93 <br />35,820,45 <br />11,415.48 <br />PD50000043 BURNER DRYER CONY TO NAT'L <br />8/1/2012 <br />N <br />31,578,23 <br />24,209.92 <br />7,368.31 <br />PD50000044 BURNER DRYER DRUM CONVERSI <br />5/2/2009 <br />N <br />49,574.29 <br />49,574.29 <br />PD50000045 BURNER DRYER CONV TO NAT'L <br />8/11/2012 <br />N <br />94,214.47 <br />72,231.04 <br />21,983.43 <br />PDS0000046 BURNER DRYER CONV TO NAT'L <br />8/1/2012 <br />N <br />61,076.49 <br />46,825.24 <br />14,251,25 <br />PFR0000001 FUME COLLECTION SYSTEM <br />10/16/2010 <br />N <br />539,930.31 <br />512,933,88 <br />26,996,43 <br />PFR0000002 BLUE SMOKERECOVERYSYSTEM <br />4/1/2007 <br />N <br />14,174.52 <br />9,449.68 <br />4,724,84 <br />PFR0000003 BLUE SMOKE RECOVERY SYSTEM <br />4/28/2008 <br />N <br />99,532.09 <br />99,532.09 <br />PFR0000004 BLUE SMOKE RECOVERY SYSTEM <br />5/2/2015 <br />N <br />109,741.03 <br />54,720.24 <br />55,020,79 <br />PFR000000S BLUE SMOKE RECOVERY SYSTEM <br />3/16/2009 <br />U <br />250,000.00 <br />165,000.00 <br />85,000.00 <br />PFR0000006 BLUE SNIOKERECOVERY SYSTEM <br />4/24/1999 <br />N <br />20,370.48 <br />18,333.43 <br />2,037.05 <br />PFR0000007 BLUE SMOKE RECOVERY SYSTEM <br />3/16/2009 <br />U <br />180,600.00 <br />119,196.00 <br />61,404.00 <br />PFR0000008 BLUE SMOKE RECOVERY SYSTEM <br />4/15/2006 <br />N <br />318,034.71 <br />318,034.71 <br />PFR0000009 FUGITIVE SYSTEM <br />4/30/1994 <br />N <br />21,501.60 <br />19,351.44 <br />2,150,16 <br />PFR0000010 BLUE SMOKE RECOVERY SYSTEM <br />5/29/2007 <br />N <br />169,258.95 <br />169,258.95 <br />PFR0000011 FUME EVACUATION SYSTEM <br />5/18/2002 <br />N <br />169,220.39 <br />152,298,35 <br />16,922.04 <br />PFR0000012 FUGITIVE SYSTEM <br />7/29/1995 <br />N <br />16,382.16 <br />14,743.94 <br />1,638.22 <br />PFR0000013 BLUE SMOKE RECOVERY SYSTEM <br />7/1/1997 <br />N <br />40,019.78 <br />36,017.80 <br />4,001.98 <br />PFR0000014 FUME EVACUATIONN-MODIFICATI <br />5/2/1998 <br />N <br />3,505,10 <br />3,154.59 <br />350.51 <br />PFR0000015 PLT IMPROVE SILO AIR POLLU <br />10/23/1993 <br />N <br />11,913,94 <br />10,722.55 <br />1,191.39 <br />PFR0000016 TANK ASPHALT CON DENSOR <br />8/2/2003 <br />N <br />15,671.25 <br />15,671.25 <br />PH00000007 TANK HOT OIL <br />3/31/2005 <br />U <br />9,700,00 <br />8,730.00 <br />970,00 <br />PH00000008 HEATER HOT OIL <br />1/3/2015 <br />U <br />18,676.80 <br />18,676.80 <br />PH00006010 HEATER INLINE FUEL <br />7/7/2001 <br />N <br />10,683,00 <br />10,683,00 <br />PH00000011 HOT OIL HEATER <br />4/1/2008 <br />N <br />35,922.18 <br />35,922,18 <br />PH00000012 HEATER HOT OIL <br />1/3/2016 <br />N <br />49,012.51 <br />20,830,44 <br />28,182.07 <br />PH00000013 HOTOILHEATER <br />4/1/1992 <br />N <br />44,315,35 <br />39,883.81 <br />4,431,54 <br />PH00000014 HEATER HOT OIL <br />10/7/1998 <br />N <br />27,825.00 <br />25,042,50 <br />2,782.50 <br />PH00000015 HOTOILHEATER, <br />2/25/2000 <br />N <br />18,651.58 <br />16,488,69 <br />2,162,89 <br />PH00000016 HOTOILHEATER <br />9/21/1999 <br />U <br />13,532.20 <br />12,178.98 <br />1,353,22 <br />PH00000017 HEATER HOT OIL <br />7/1/2018 <br />N <br />161,643.60 <br />28,287.63 <br />133,355,97 <br />PH00000018 HEATER HOT OIL <br />3/16/2009 <br />U <br />15,000.00 <br />9,900,00 <br />5,100,00 <br />PH00000019 PREHEATER OIL <br />9/20/1979 <br />N <br />3,784.56 <br />3,406.10 <br />378,46 <br />PH00000020 HEATER HOTOIL 275 GAL <br />10/15/1999 <br />N <br />31,581.75 <br />28,423.57 <br />3,158,18 <br />PH00000021 HEATER HOT OIL <br />6/3/2018 <br />N <br />82,127.32 <br />15,056,58 <br />67,070,74 <br />PH00000022 HEATER HOT OIL <br />3/16/2009 <br />U <br />10,000.00 <br />6,600,00 <br />3,400,00 <br />PH00000023 HEATER HOT OIL <br />8/9/2005 <br />U <br />6,643.60 <br />6,643,60 <br />PH00000024 HOT FUEL OIL STORAGE <br />8/29/1988 <br />N <br />12,064.78 <br />10,858.30 <br />1,206.48 <br />PH00000026 HEATER ASPHALT <br />3/31/2005 <br />U <br />5,000,00 <br />4,250,00 <br />750,00 <br />