ENGINEER'S ESTIMATE
<br /> CITY OF SOUTH BEND
<br /> April 17,2012
<br /> Project Name:Main Slreet/Lafavette Boatyard Connecter
<br /> Project No.:,710-058
<br /> For Bids Due:5,as
<br /> BASE BID
<br /> ITEM NO, DESCRIPTION QTY UNIT ��
<br /> UNIT PRICE TOTAL AMOUNT
<br /> 1 DEWATERING AND PROTECTION OF EXISTING STRUCTURES 1 LS
<br /> S5,000.00 S5,000.00
<br /> 2 CONSTRUCTION ENGINEERING 1 LS
<br /> $34,000.00 S94,000•00
<br /> 3 CPM SCHEDULE 1 LS
<br /> $1,250.00 $1,250.00
<br /> 4 CPM SCHEDULE,MONTHLY UPDATE 13
<br /> $200.00 $2,600.00
<br /> 5 MOBILIZATION AND DEMOBILIZATION 1 LS
<br /> $233,000.00 5233,000.00
<br /> 6 CLEARING RIGHT-OF-WAY 1 LS
<br /> MR5140,000.00 $140,000.00
<br /> PIPE,REMOVE EXISTING STORM SEWER 73 LFT
<br /> $15.00 31,095.00
<br /> 8 PIPE,REMOVE EXISTING WATER MAIN 10 LFT
<br /> 515.00 $150.00
<br /> 9 STRUCTURE REMOVE,EXISTING STORM MANHOLE 15 EACH
<br /> 31.000,00 S15,000.00
<br /> 10 STRUCTURE REMOVE,EXISTING SANITARY MANHOLE 2 EACH
<br /> 51,200.00 $2,400.00
<br /> 11 REMOVE,EXISTING CAP,6-INCHES 2 EACH
<br /> $300.00 S800.00
<br /> 12 REMOVE,EXISTING CAP,8-INCHES 1 EACH
<br /> $350.00 S350.00
<br /> IIIIIIREMOVE,EXISTING CAP,10-INCHES 1 EACH
<br /> $500.00 S500.00
<br /> =REMOVE,EXISTING FIRE HYDRANT 2 EACH
<br /> $1,000.00 52,040.00
<br /> 15 ABANDON,EXISTING STORM SEWER 589 . LFT
<br /> $20.00 $11,784.40
<br /> 16 ABANDON,EXISTING SANITARY SEWER 680 LFT
<br /> $20.00 513,600.00
<br /> 17 ABANDON,EXISTING SANITARY MANHOLE 2
<br /> 31,000.00 42,400.00
<br /> 18 ABANDON,EXISTING WATER MAIN 485 LFT
<br /> $15.00 57,275.00
<br /> 19 PAVEMENT REMOVAL
<br /> 100 SYS 115.00
<br /> $1,500.00
<br /> 20 COMMON EXCAVATION 35,611 CY$
<br /> $8.00 $284,888.00
<br /> ®TEMPORARY EROSION AND SEDIMENT CONTROL 1 LS
<br /> " 337,000.00
<br /> 22 COMPACTED AGGREGATE BASE,NO.53,EASE 9,130 TON 321 OD
<br /> 5191,730.00
<br /> 23 COMPACTED AGGREGATE BASE,NO.73,BASE 20 TON
<br /> $21.00 5420.00
<br /> 24 MILLING,ASPHALT, 1-1/2 INCH 176 SYS
<br /> $4.00 $704.00
<br /> 25 HMA SURFACE,TYPE B 1,390 TON 568,00
<br /> $94,520.00
<br /> 11111HMA INTERMEDIATE,TYPE B
<br /> 2,280 TON 564.00
<br /> 27 HMA BASE,TYPE B Si45,924.00
<br /> 7,290 TON 553.00
<br /> 28 HMA PATCHING,TYPE B 5386,370.00
<br /> 260 TON 5100.00
<br /> 29 ASPHALT FOR TACK COAT S26,000.Op
<br /> 19.5 SYS 51.00
<br /> $180
<br /> 30 PLAIN CEMENT CONCRETE PAVEMENT PATCH,8-INCHES SYS $45.00
<br /> 54,140.000
<br /> Lawson-Fisher Associates P.C.
<br />
|