Laserfiche WebLink
BID TABULATION <br />IGNITION PARK: EV CHARGING PARK PROJECT <br />Project No: 120-044R <br />IGNITION PARK: EV CHARGING PARK REBID <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost <br />1 Mobilization and Demobilization 1 LSUM $16,334.50 $16,334.50 $55,629.00 $55,629.00 $35,773.50 $35,773.50 $10,000.00 $10,000.00 <br />2 CONCRETE CURB & GUTTER REMOVAL 175 LFT $15.00 $2,625.00 $26.93 $4,712.75 $11.00 $1,925.00 $18.17 $3,179.75 <br />3 EARTHWORK 1775 CYD $35.00 $6,300.00 $14.91 $26,465.25 $14.30 $25,382.50 $26.70 $47,392.50 <br />4 COMMON EXCAVATION 720 CYD $50.00 $36,000.00 $19.17 $13,802.40 $15.90 $11,448.00 $26.55 $19,116.00 <br />5 HMA INTERMEDIATE, TYPE B 280 TON $80.00 $22,400.00 $76.68 $21,470.40 $92.00 $25,760.00 $84.19 $23,573.20 <br />6 HMA SURFACE, TYPE B 140 TON $120.00 $16,800.00 $133.13 $18,638.20 $110.00 $15,400.00 $117.47 $16,445.80 <br />7 COMPATCTED AGGREGATE , No. 53 550 CYD $65.00 $35,750.00 $44.20 $24,310.00 $19.00 $10,450.00 $53.63 $29,496.50 <br />8 PCCP FOR APPROACH, REINFORCED 120 SYD $85.00 $10,200.00 $51.69 $6,202.80 $70.00 $8,400.00 $59.83 $7,179.60 <br />9 SIDEWALK, CONCRETE, 4"715 SYD $63.00 $45,045.00 $41.54 $29,701.10 $59.00 $42,185.00 $38.37 $27,434.55 <br />10 CURB RAMP, CONCRETE 16 SYD $125.00 $2,000.00 $75.75 $1,212.00 $245.00 $3,920.00 $222.11 $3,553.76 <br />11 CONCRETE CURB 1100 LFT $32.00 $35,200.00 $24.49 $26,939.00 $48.00 $52,800.00 $26.09 $28,699.00 <br />12 CURB TURNOUT 7 EA $250.00 $1,750.00 $444.57 $3,111.99 $875.00 $6,125.00 $641.20 $4,488.40 <br />13 CONCRETE PARKING STOP 15 EA $300.00 $4,500.00 $79.87 $1,198.05 $85.00 $1,275.00 $85.00 $1,275.00 <br />14 STORM SEWER PIPE, 12 IN 80 LFT $80.00 $6,400.00 $53.25 $4,260.00 $34.00 $2,720.00 $82.79 $6,623.20 <br />15 STORM CASTING REPLACEMENT 1 EA $1,800.00 $1,800.00 $2,663.00 $2,663.00 $4,100.00 $4,100.00 $1,253.07 $1,253.07 <br />16 TESCO CABINET, FOUNDATION, WIRING, ETC 1 EA $12,000.00 $12,000.00 $24,166.00 $24,166.00 $19,500.00 $19,500.00 $19,500.00 $19,500.00 <br />17 ELECTRICAL SERVICE CONNECTION 1 LSUM $9,000.00 $9,000.00 $1,065.00 $1,065.00 $1,750.00 $1,750.00 $1,750.00 $1,750.00 <br />18 LIGHT STANDARD, TYPE A 1 EA $6,000.00 $6,000.00 $5,634.00 $5,634.00 $4,300.00 $4,300.00 $4,300.00 $4,300.00 <br />19 LIGHT STANDARD, TYPE B 1 EA $6,000.00 $6,000.00 $4,686.00 $4,686.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 <br />20 LIGHT POLE FOUNDATION 2 EA $900.00 $1,800.00 $905.50 $1,811.00 $1,000.00 $2,000.00 $1,000.00 $2,000.00 <br />21 EV CHARGING FOUNDATION (18"x18"X18")7 CYD $300.00 $2,100.00 $203.00 $1,421.00 $600.00 $4,200.00 $600.00 $4,200.00 <br />22 LIGHTING CONDUIT, PVC, SCH 80, 3 IN 270 LFT $10.00 $2,700.00 $13.31 $3,593.70 $9.75 $2,632.50 $9.75 $2,632.50 <br />23 LIGHTING CONDUIT, PVC, SCH 80, 3 IN, DIRECTION DRILL 50 LFT $20.00 $1,000.00 $29.82 $1,491.00 $25.00 $1,250.00 $25.00 $1,250.00 <br />24 EV CHARGING CONDUIT, PVC SCH 40, 3 IN 375 LFT $10.00 $3,750.00 $13.31 $4,991.25 $9.75 $3,656.25 $9.75 $3,656.25 <br />25 LIGHTING WIRING 360 LFT $8.00 $2,880.00 $3.73 $1,342.80 $9.00 $3,240.00 $9.00 $3,240.00 <br />26 ELECTRIC PULL BOX 5 EA $1,000.00 $5,000.00 $1,065.00 $5,325.00 $650.00 $3,250.00 $650.00 $3,250.00 <br />27 THERMOPLASTIC LINE, SOLID, WHITE, 6 IN 110 LFT $3.00 $330.00 $6.39 $702.90 $3.95 $434.50 $3.95 $434.50 <br />28 THERMOPLASTIC LINE, SOLID, YELLOW, 4 IN 530 LFT $2.00 $1,060.00 $1.14 $604.20 $2.05 $1,086.50 $2.05 $1,086.50 <br />29 THERMOPLASTIC LINE, SOLID, BLUE, 4 IN 125 LFT $3.00 $375.00 $1.06 $132.50 $5.45 $681.25 $5.45 $681.25 <br />30 PAVEMENT MESSAGE HC MARKING, BLUE 1 EA $400.00 $400.00 $27.00 $27.00 $45.00 $45.00 $45.00 $45.00 <br />31 HANDICAP SIGN/POST 1 EA $500.00 $500.00 $266.00 $266.00 $325.00 $325.00 $325.00 $325.00 <br />32 ELEC VEHICLE SIGN/POST 4 EA $500.00 $2,000.00 $346.00 $1,384.00 $325.00 $1,300.00 $325.00 $1,300.00 <br />33 STOP SIGN/POST 2 EA $500.00 $1,000.00 $282.00 $564.00 $180.00 $360.00 $180.00 $360.00 <br />34 OVERSTORY TREE, 2 1/2 IN CALIPER 12 EA $450.00 $5,400.00 $612.42 $7,349.04 $575.00 $6,900.00 $728.00 $8,736.00 <br />35 HYDROMULCH, SEEDING AND TOPSOIL 1750 SYD $12.00 $21,000.00 $12.97 $22,697.50 $12.50 $21,875.00 $10.62 $18,585.00 <br />36 SWALE SEED MIX AND TOPSOIL 725 SYD $5.00 $3,625.00 $5.56 $4,031.00 $10.00 $7,250.00 $13.02 $9,439.50 <br />37 TEMPORARY EROSION CONTROL MEASURES 1 LSUM $12,000.00 $12,000.00 $9,053.00 $9,053.00 $11,800.00 $11,800.00 $2,821.58 $2,821.58 <br />$343,024.50 $342,653.83 $349,000.00 $322,803.41 <br />Engineer's Estimate Robert Henry Corporation <br />Total <br />Rieth-Riley Construction Co.Milestone Contractors North <br />H:\2020 Projects\2020-0197\Bidding\2021-04-15 REBid Tabulation.xlsx