BID/PROPOSAL Addendum No. 1
<br />CITY OF SOUTH BEND
<br />26.
<br />Concrete Curb Ramp
<br />175
<br />SYD
<br />$218.00
<br />$38,150.00
<br />27.
<br />Concrete Center Curb, Type B
<br />13
<br />SYD
<br />$155.00
<br />$2,015.00
<br />28.
<br />Concrete Driveway Approach, 6"
<br />25
<br />SYD
<br />$82.00
<br />$2, 050.00
<br />29.
<br />Concrete Driveway Approach, 8"
<br />186
<br />SYD
<br />$84.50
<br />$15 , 717.00
<br />30.
<br />Sodding
<br />710
<br />SYD
<br />$8.35
<br />$5, 928.50
<br />31.
<br />Tree, Princeton Elm, 2.5"
<br />15
<br />EA
<br />$615.00
<br />$9,225.00
<br />32.
<br />Tree, Prairie Sentinel Hackberry, 2.5"
<br />2
<br />EA
<br />$625.00
<br />$1,250.00
<br />33.
<br />Tree, American Linden, 2.5"
<br />2
<br />EA
<br />$615.00
<br />$1,230.00
<br />34.
<br />Tree, Common Hackberry, 2.5"
<br />2
<br />EA
<br />$615.00
<br />$1,230.00
<br />35.
<br />Tree, Black Tupelo, 2.5"
<br />2
<br />EA
<br />$705. 0 0
<br />$1, 410.00
<br />36.
<br />American Sweetgum, 2.5"
<br />2
<br />EA
<br />$615.00
<br />$1,230.00
<br />37.
<br />Tree Grates
<br />2
<br />EA
<br />$1, 600.00
<br />$3,200.00
<br />38.
<br />Curb Identification Markers
<br />15
<br />EA
<br />$275.00
<br />$4, 125.00
<br />39.
<br />Adjust Casting to Grade
<br />10
<br />EA
<br />$330.00
<br />$3,300.00
<br />40.
<br />Storm Sewer Pipe, 12"
<br />336
<br />LFT
<br />$52.00
<br />$17,472.00
<br />41.
<br />Storm Sewer Catch Basin
<br />5
<br />EA
<br />$2, 675.00
<br />$13, 375.00
<br />42.
<br />Storm Sewer Manhole
<br />3
<br />EA
<br />$5, 475.00
<br />$16, 425.00
<br />43.
<br />Replace Existing Casting
<br />4
<br />EA
<br />$910.00
<br />$3, 640.00
<br />44.
<br />Connect Proposed Pipe to Existing Structure
<br />4
<br />EA
<br />$1, 790.00
<br />$7,160.00
<br />45.
<br />Sign, Remove and Relocate
<br />4
<br />EA
<br />$200.00
<br />$800.00
<br />46.
<br />Sheet Sign
<br />12.5
<br />SFT
<br />$13.00
<br />$162.50
<br />47.
<br />Sign Post, Type 1
<br />20
<br />LFT
<br />$15.00
<br />$300.00
<br />48.
<br />Light Pole Assembly and Foundation
<br />10
<br />EA
<br />$7, 100.00
<br />$71, 000.00
<br />49.
<br />LED Bollard
<br />16
<br />EA
<br />$2,200.00
<br />$35,200.00
<br />50.
<br />Conduit, PVC, 2", Schedule 80 and No. 4 Copper 1/C
<br />925
<br />LFT
<br />$13.00
<br />$12, 025.00
<br />51.
<br />Handhole for Lighting
<br />4
<br />EA
<br />$800.00
<br />$3,200.00
<br />52.
<br />Miscellaneous Equipment for Lighting
<br />1
<br />LS
<br />$1,200.00
<br />$1,200.00
<br />53.
<br />White, Solid, Thermoplastic, 4", Grooved
<br />150
<br />LFT
<br />$2.90
<br />$435.00
<br />54.
<br />White, Solid, Thermoplastic, 6"
<br />205
<br />LFT
<br />$4.85
<br />$994.25
<br />55.
<br />Yellow, Solid, Thermoplastic, 4", Grooved
<br />1,774
<br />LFT
<br />$2.90
<br />$5, 144.60
<br />56.
<br />Stop Bar, Thermoplastic, 24"
<br />90
<br />LFT
<br />$8.95
<br />$805.50
<br />57.
<br />Lane Indication Arrow, Thermoplastic
<br />2
<br />EA
<br />$100 . 0 0
<br />$200 .0 0
<br />Version 4/2/2019 Contractor's Bid for Public Works - 8
<br />
|