Laserfiche WebLink
BID/PROPOSAL Addendum No. 1 <br />CITY OF SOUTH BEND <br />26. <br />Concrete Curb Ramp <br />175 <br />SYD <br />$218.00 <br />$38,150.00 <br />27. <br />Concrete Center Curb, Type B <br />13 <br />SYD <br />$155.00 <br />$2,015.00 <br />28. <br />Concrete Driveway Approach, 6" <br />25 <br />SYD <br />$82.00 <br />$2, 050.00 <br />29. <br />Concrete Driveway Approach, 8" <br />186 <br />SYD <br />$84.50 <br />$15 , 717.00 <br />30. <br />Sodding <br />710 <br />SYD <br />$8.35 <br />$5, 928.50 <br />31. <br />Tree, Princeton Elm, 2.5" <br />15 <br />EA <br />$615.00 <br />$9,225.00 <br />32. <br />Tree, Prairie Sentinel Hackberry, 2.5" <br />2 <br />EA <br />$625.00 <br />$1,250.00 <br />33. <br />Tree, American Linden, 2.5" <br />2 <br />EA <br />$615.00 <br />$1,230.00 <br />34. <br />Tree, Common Hackberry, 2.5" <br />2 <br />EA <br />$615.00 <br />$1,230.00 <br />35. <br />Tree, Black Tupelo, 2.5" <br />2 <br />EA <br />$705. 0 0 <br />$1, 410.00 <br />36. <br />American Sweetgum, 2.5" <br />2 <br />EA <br />$615.00 <br />$1,230.00 <br />37. <br />Tree Grates <br />2 <br />EA <br />$1, 600.00 <br />$3,200.00 <br />38. <br />Curb Identification Markers <br />15 <br />EA <br />$275.00 <br />$4, 125.00 <br />39. <br />Adjust Casting to Grade <br />10 <br />EA <br />$330.00 <br />$3,300.00 <br />40. <br />Storm Sewer Pipe, 12" <br />336 <br />LFT <br />$52.00 <br />$17,472.00 <br />41. <br />Storm Sewer Catch Basin <br />5 <br />EA <br />$2, 675.00 <br />$13, 375.00 <br />42. <br />Storm Sewer Manhole <br />3 <br />EA <br />$5, 475.00 <br />$16, 425.00 <br />43. <br />Replace Existing Casting <br />4 <br />EA <br />$910.00 <br />$3, 640.00 <br />44. <br />Connect Proposed Pipe to Existing Structure <br />4 <br />EA <br />$1, 790.00 <br />$7,160.00 <br />45. <br />Sign, Remove and Relocate <br />4 <br />EA <br />$200.00 <br />$800.00 <br />46. <br />Sheet Sign <br />12.5 <br />SFT <br />$13.00 <br />$162.50 <br />47. <br />Sign Post, Type 1 <br />20 <br />LFT <br />$15.00 <br />$300.00 <br />48. <br />Light Pole Assembly and Foundation <br />10 <br />EA <br />$7, 100.00 <br />$71, 000.00 <br />49. <br />LED Bollard <br />16 <br />EA <br />$2,200.00 <br />$35,200.00 <br />50. <br />Conduit, PVC, 2", Schedule 80 and No. 4 Copper 1/C <br />925 <br />LFT <br />$13.00 <br />$12, 025.00 <br />51. <br />Handhole for Lighting <br />4 <br />EA <br />$800.00 <br />$3,200.00 <br />52. <br />Miscellaneous Equipment for Lighting <br />1 <br />LS <br />$1,200.00 <br />$1,200.00 <br />53. <br />White, Solid, Thermoplastic, 4", Grooved <br />150 <br />LFT <br />$2.90 <br />$435.00 <br />54. <br />White, Solid, Thermoplastic, 6" <br />205 <br />LFT <br />$4.85 <br />$994.25 <br />55. <br />Yellow, Solid, Thermoplastic, 4", Grooved <br />1,774 <br />LFT <br />$2.90 <br />$5, 144.60 <br />56. <br />Stop Bar, Thermoplastic, 24" <br />90 <br />LFT <br />$8.95 <br />$805.50 <br />57. <br />Lane Indication Arrow, Thermoplastic <br />2 <br />EA <br />$100 . 0 0 <br />$200 .0 0 <br />Version 4/2/2019 Contractor's Bid for Public Works - 8 <br />