Laserfiche WebLink
REGULAR MEETING <br />APRIL 13, 2021 49 <br />Division F — Snow Removal Materials <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />F-1 <br />Curved Double Bevel Carbon <br />300 <br />EA <br />No Bid <br />No Bid <br />Steel Underbody Blade 5'L x <br />6"T x 5/8"Th <br />F-2 <br />Curved Single Bevel Carbon <br />50 <br />EA <br />No Bid <br />No Bid <br />Steel Underbody Blade 5'L x <br />6"T x 3/4"Th Heat Treated - <br />Hardened <br />F-3 <br />Curved Single Bevel Carbon <br />50 <br />EA <br />No Bid <br />No Bid <br />Steel Underbody Blade 6'L x <br />6"T x 3/4"Th Heat Treated - <br />Hardened <br />F-4 <br />Boss Power V Plow Blade 5 1 " <br />6 <br />EA <br />No Bid <br />No Bid <br />x 6" x 1/2" Part #BAL08858 <br />Passenger Side Edge <br />F-5 <br />Boss Power V Plow Blade 5 1 " <br />6 <br />EA <br />No Bid <br />No Bid <br />x 6" x'/2" Part #BAL08859 <br />Drivers Side Edge <br />F-6 <br />8' 6" Western MVP Plus Plow <br />6 <br />EA <br />No Bid <br />No Bid <br />Blade Part #44285-1 <br />F-7 <br />Western Pro Plus Plow Blades <br />6 <br />EA <br />No Bid <br />No Bid <br />90"L x 6"T x '/2"Th <br />TOTAL: $ <br />RIETH-RILEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />ralvaradona,rieth-riley.com <br />Bid was signed by Mr. Ruben Alvarado <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />BID: <br />Division A — PCC Materials <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />A-1 <br />Class A Concrete <br />2,500 <br />CY <br />No Bid <br />No Bid <br />A-2 <br />Class A High Early <br />800 <br />CY <br />No Bid <br />No Bid <br />A-3 <br />7 Bag Mix — New City Secs <br />600 <br />CY <br />No Bid <br />No Bid <br />A-4 <br />High Early Concrete w/ <br />Intejaral Color- Black <br />350 <br />CY <br />No Bid <br />No Bid <br />A-5 <br />Flowable Fill, Removable <br />350 <br />CY <br />No Bid <br />No Bid <br />A-6 <br />Non -Chloride Accelerator <br />added to concrete — 0.5% <br />325 <br />EA CY <br />No Bid <br />No Bid <br />A-7 <br />Non -Chloride Accelerator <br />added to concrete —1 % <br />1000 <br />EA CY <br />No Bid <br />No Bid <br />A-8 <br />Non -Chloride Accelerator <br />added to concrete —1 <br />2100 <br />EA CY <br />No Bid <br />No Bid <br />Division B — Aggregate Materials <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />B-1 <br />No. 23 Sand <br />5,000 <br />TON <br />$12.00 <br />$ <br />B-2 <br />No. 53 Gravel <br />1000 <br />TON <br />$ <br />No Bid <br />B-3 <br />No. 53 Recycled Concrete <br />7500 <br />TON <br />$15.00 <br />$ <br />B-4 <br />No. 53 Slag <br />1000 <br />1 TON <br />1 $18.00 <br />1 $ <br />B-5 <br />Topsoil <br />500 <br />CY <br />$ <br />No Bid <br />B-6 <br />No. 11 Slag Chip Stone <br />1000 <br />TON <br />$21.25 <br />$ <br />