Laserfiche WebLink
REGULAR MEETING <br />APRIL 13, 2021 47 <br />6"T x 3/4"Th Heat Treated - <br />Hardened <br />F-3 <br />Curved Single Bevel Carbon <br />50 <br />EA <br />No Bid <br />No Bid <br />Steel Underbody Blade 6'L x <br />6"T x 3/4"Th Heat Treated - <br />Hardened <br />F-4 <br />Boss Power V Plow Blade 5 1 " <br />6 <br />EA <br />No Bid <br />No Bid <br />x 6" x'/2" Part #BAL08858 <br />Passenger Side Edge <br />F-5 <br />Boss Power V Plow Blade 5 1 " <br />6 <br />EA <br />No Bid <br />No Bid <br />x 6" x 1/2" Part #BAL08859 <br />Drivers Side Edge <br />F-6 <br />8' 6" Western MVP Plus Plow <br />6 <br />EA <br />No Bid <br />No Bid <br />Blade Part #44285-1 <br />F-7 <br />Western Pro Plus Plow Blades <br />6 <br />EA <br />No Bid <br />No Bid <br />90"L x 6"T x 1/z"Th <br />TOTAL: $606,693.75 <br />OZINGA READY MIX CONCRETE, INC. <br />715 W. Ireland Rd. <br />South Bend, IN 46614 <br />scottunderwoodna,ozin ag com <br />Bid was signed by Mr. Scott Underwood <br />Non -Collusion, Non -Discrimination Affidavit Form was completed. <br />Five percent (5%) Bid Bond was submitted. <br />BID: <br />Division A — PCC Materials <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />A-1 <br />Class A Concrete <br />2,500 <br />CY <br />$115.00 <br />A-2 <br />Class A High Early <br />800 <br />CY <br />$125.00 <br />A-3 <br />7 Bag Mix — New City Secs <br />600 <br />CY <br />$138.00 <br />A-4 <br />High Early Concrete w/ <br />Integral Color- Black <br />350 <br />CY <br />$215.00 <br />A-5 <br />Flowable Fill, Removable <br />350 <br />CY <br />$78.00 <br />A-6 <br />Non -Chloride Accelerator <br />added to concrete — 0.5% <br />325 <br />EA CY <br />$2.75 <br />A-7 <br />Non -Chloride Accelerator <br />added to concrete —1 % <br />1000 <br />EA CY <br />$5.50 <br />A-8 <br />Non -Chloride Accelerator <br />added to concrete —1 <br />2100 <br />EA CY <br />$11.00 <br />Division B — Aggregate Materials <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />B-1 <br />No. 23 Sand <br />5,000 <br />TON <br />$16.35 <br />$ <br />B-2 <br />No. 53 Gravel <br />1000 <br />TON <br />$23.50 <br />$ <br />B-3 <br />No. 53 Recycled Concrete <br />7500 <br />TON <br />$13.85 <br />$ <br />B-4 <br />I No. 53 Slag <br />1000 <br />1 TON <br />1 $19.25 <br />1 $ <br />B-5 <br />To soil <br />500 <br />CY <br />No Bid <br />No Bid <br />B-6 <br />No. 11 Slag Chip Stone <br />1000 <br />TON <br />$20.85 <br />$ <br />Division C — Sewer Materials - Castings <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total <br />No. <br />C-1 <br />Manhole Cover & Frame — EJ <br />300 <br />EA <br />No Bid <br />No Bid <br />1045 Frame w/1040 SB Cover <br />C-2 <br />Catch Basin Cover & Frame <br />300 <br />EA <br />No Bid <br />No Bid <br />EJ 2996 Frame w/1020 Grate <br />