My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
I&M Memorandum of Use and License Agreement - Installation of 69kV Transmission Line – Indiana Michigan Power
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
I&M Memorandum of Use and License Agreement - Installation of 69kV Transmission Line – Indiana Michigan Power
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2021 11:43:00 AM
Creation date
4/15/2021 11:29:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/13/2021
Text box
ID:
1
Creator:
Created:
4/15/2021 11:42 AM
Modified:
4/15/2021 11:42 AM
Text:
Trees and woody vegetation will be cleared, and will be kept clear, from a 10-foot-wide (5 feet on either side of centerline) area over the Project centerline. Tree and woody vegetation clearing outside of the 10-foot-wide area over the centerline will occur within a 30-foot-wide area (15 feet on either side of centerline) only for construction access, as needed, and such clearing may include removal of trees and woody vegetation and/or trimming of trees, limbs, and woody vegetation to achieve a 25-feet-from-grade vertical clearance, as needed, for construction access.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STRM-03R <br />93+00 <br />94+00 <br />9 <br />5 <br />+ <br />0 <br />0 <br />9 <br />6 <br />+ <br />0 <br />0 <br />9 <br />7 <br />+ <br />0 <br />0 <br />98+0099+00100+00101+00No Tree or Shrub Clearingnorth of this area,since transmission linewith be installed viaHorizontal DirectionalDrill (HDD) in this area. <br />No tree or shrub clearing isrequired over the area of thehorizontal directional drill. <br />No Tree or Shrub Clearingsouth of this area,since transmission linewith be installed viaHorizontal DirectionalDrill (HDD) in this area. <br />No construction access on multi-usetrail south of this pointdue to slope stability issues. <br />No construction accesson multi-use trail southof this point due toslope stability issues. <br />Protect curbs andsidewalks with timbersand mats if crossingwith tree clearingequipment or vehicles. <br />SaintJosephRiver <br />E Corby N LawrenceN StanfieldN Nil <br />e <br />s <br />N Riv <br />ersid <br />e <br />32 <br />Map 3 <br />Map 5 <br />12 3 45678 <br />NAD 1983 StatePlane Indiana East FIPS 1301 FeetProjection: Transverse MercatorDatum: North American 1983 <br />Date: 4/9/2021 <br />Author: DHB <br />Prj: Muessel Station, 144793, P15081001, Colfax, IN <br />Proposed Transmission Line <br />Horizontal Directional Drill Area <br />Project Work Area <br />Street <br />Tree Clearing Note <br />Bore Slurry Pit <br />HDD Work A rea <br />Spoils <br />Delineated Perennial Stream/Bank <br /> <br /> <br />Map 4 of 8 <br />State of IndianaSt. Joseph CountyPortage Township <br />1 " = 100 ' <br />0 50 100 <br />FeetDocument Path: H:\144793_Muessel_Stn_P15081001\GIS\TREECLR_PWR144793_Muessel_Stn_STP15081008_MapTiles2400_11x17L_20210406.mxdMuessel-Colfax 69kV U/G ProjectPhase II <br />Exhibit D - City Tree Clearing <br />Parcel Boundary <br />Tree Survey Area for License Area (City Owned) <br />EXHIBIT D -Page 5 of 9
The URL can be used to link to this page
Your browser does not support the video tag.