My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Water Treatment Chemicals 2021-2022 - Shannon Chemical Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Bids
>
Opening of Bids - Water Treatment Chemicals 2021-2022 - Shannon Chemical Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 4:34:37 PM
Creation date
4/14/2021 4:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L CHLORINE SPECIFICATIONS <br />INCLUDE BOTH 150#AND TON CYLINDERS <br />A. GENERAL <br />1. Only containers which currently are authorized by regulation for chlorine, <br />which have been inspected and reconditioned as described herein, and which <br />have been tested within the period required by regulations should be filled. It <br />is illegal to ship chlorine containers that have been filled by or without the <br />consent of the owner. <br />2. Due to the volatile nature of this chemical, the chlorine provider must be able <br />to have one (1) accredited Safety and Handling of Chlorine class per year for <br />South Bend Personnel. <br />3. Chlorine quotes should be deposit -free. No cylinder deposit should be <br />included in the quote. <br />Bonin Point <br />-29.290F-34.050C <br />Critical Density <br />35.77 lb./cu. ft. <br />Critical Pressure <br />1118.4 psia 76.1 Atmos. <br />Critical Temperature <br />291.200 144.0C <br />Critical Volume <br />0.02796 cu. ft./lb. <br />Latent Heat of Vaporization <br />123.7 Btu./lb. @Boiling point <br />Liquid Gas Relationship: <br />1 volume liquid chlorine — wt. at <br />457.6 volumes of chlorine, 825 @ <br />standard conditions <br />Melting Point <br />449.76°F 400.98°C <br />Specific Gravity - Dry Gas <br />2.482 <br />Specific Gravity — Liquid <br />1.468 0 ° - 40C <br />B. CHLORINE 150 POUND CYLINDERS <br />1. Construction <br />a) All cylinder°s must be compatible tivith Chlorine Institute Emergency Kit "A". All <br />kit devices must be arseable on any cylinder in chlorine service. Tlie maxirnurn <br />neck ring diameter that ivill accommodate an "A" hood is 4-314 inches. <br />2. Cylinder Types <br />a) Chlorine cylinders must comply with DOT specs, 3A480, 3AA480, 25, 3, 3BN480 <br />or 3E1800. The regulations permit only one opening in chlorine cylinders - at <br />the top for the valve connection. <br />3. Cylinder Styles <br />a) Cylinders may be of three styles: footring, bumped bottom, or° double bottom. <br />4. Cylinder Threads <br />a) TI7e threads in new cylinders are NGT threads 3/4-14NGT(CI). <br />
The URL can be used to link to this page
Your browser does not support the video tag.