Rieth-Riley Construction Co., Inc.
<br />Equipment List
<br />3/31/2020
<br />Acquired New or
<br />Asset #
<br />Description
<br />Acquisition Date
<br />Used
<br />Cost
<br />Accum Depr
<br />NBV
<br />PSS0000037
<br />SCREEN TRIPLE DECK
<br />3/31/2005
<br />U
<br />35,000.00
<br />31,500.00
<br />3,500'.00
<br />P5S0000039
<br />SCREEN DECKTRIPLE
<br />12/29/2006
<br />U
<br />5,700.00
<br />5,700.00
<br />-
<br />PSS0000040
<br />SCREEN DECK TRIPLE
<br />7/1/2016
<br />U
<br />25,000.00
<br />4,785.70
<br />20,214.30
<br />PSS0000041
<br />SCREEN DECK TRIPLE
<br />7/1/2016
<br />U
<br />25,000.00
<br />4,785.70
<br />20,214.30
<br />PSS0000042
<br />SCREEN DECK TRIPLE
<br />7/1/2016
<br />U
<br />5,000.00
<br />956.98
<br />4,043.02
<br />PSS0000043
<br />SCREEN DECK TRIPLE 7 X 20
<br />5/31/2018
<br />U
<br />485,129.70
<br />48,328.14
<br />436,801.56
<br />PSS0000044
<br />SCREEN DECK TRIPLE
<br />7/1/2016
<br />U
<br />30,000.00
<br />5,742.80
<br />24,257.20
<br />PSS0000047
<br />SCREEN COLD FEED
<br />1/17/2019
<br />N
<br />37,314.81
<br />3,420.56
<br />33,894.25
<br />PS00000003
<br />PLT IMPROVE-KENTY AVE
<br />8/8/1986
<br />N
<br />96,750.15
<br />87,075.13
<br />9,675.02
<br />PS00000004
<br />PLT IMPROVEMENT-KTCY AVE
<br />8/29/1987
<br />N
<br />105,667.06
<br />95,100.35
<br />10,566.71
<br />PS00000005
<br />INSPECTION SAMPLING RACK
<br />4/13/2001
<br />N
<br />5,058.56
<br />4,552.76
<br />505.80
<br />PS00000006
<br />RACK TRUCK SPRAY DOWN
<br />4/13/2001
<br />N
<br />5,194.00
<br />4,674.60
<br />519.40
<br />PS00000007
<br />PLANT ADD'L COST AFTER LEA
<br />4/15/2001
<br />N
<br />32,755.63
<br />27,459.93
<br />5,295.70
<br />PS00000008
<br />PLANT SET UP #367
<br />2/25/2000
<br />N
<br />516,846.61
<br />465,161.95
<br />51,684.66
<br />PS00000009
<br />SILO MINERAL FILLER (SETUP
<br />4/29/2002
<br />N
<br />104,713.62
<br />94,242.26
<br />10,471.36
<br />P500000010
<br />PLANT MODIFICATIONS
<br />7/31/1986
<br />N
<br />82,657.01
<br />82,657.01
<br />-
<br />PS00000011
<br />PLANT SET UP
<br />4/4/1989
<br />N
<br />11,676.09
<br />10,508.48
<br />1,167.61
<br />PS00000012
<br />INSPECTION SAMPLING RACK
<br />5/22/2000
<br />N
<br />5,835.00
<br />5,251.50
<br />583.50
<br />PS00000013
<br />PLTIMPROVEMENT-H&B DRUM
<br />8/29/1987
<br />N
<br />45,996.89
<br />41,397.20
<br />4,599.69
<br />PS00000014
<br />INSPECTION SAMPLING RACK
<br />7/1/2002
<br />N
<br />5,349.82
<br />4,814.84
<br />534.98
<br />PS00000015
<br />PLT IMPROVEMENT-B-G DRUM
<br />8/29/1987
<br />N
<br />49,125.72
<br />44,213.15
<br />4,912.57
<br />PS00000016
<br />PLATFORM 20' AND 40' WALKO
<br />5/5/1998
<br />N
<br />9,860.00
<br />8,874.00
<br />986.00
<br />PS00000019
<br />FREIGHT PORTABLE PLANT #42
<br />6/17/2005
<br />N
<br />34,700.00
<br />34,700.00
<br />-
<br />PTC0000001
<br />CONVEYOR TRANSFER
<br />2/4/2003
<br />U
<br />9,300.00
<br />8,370.00
<br />930.00
<br />PTC0000002
<br />CONVEYOR TRANSFER
<br />2/4/2003
<br />U
<br />9,300.00
<br />8,370.00
<br />930.00
<br />PTC0000003
<br />CONVEYOR TRANSFER
<br />2/4/2003
<br />U
<br />9,300.00
<br />8,370.00
<br />930.00
<br />PTC0000004
<br />CONVEYOR TRANSFER
<br />2/4/2003
<br />U
<br />8,300.00
<br />7,470.00
<br />830.00
<br />PTC0000005
<br />MIX CONVEYOR SYSTEM
<br />12/14/2010
<br />U
<br />93,822.14
<br />93,822.14
<br />-
<br />PTC0000006
<br />CONVEYOR TRANSFER INCLINE
<br />4/1/2003
<br />N
<br />65,091.63
<br />58,582.47
<br />6,509.16
<br />PTC0000007
<br />MIX CONVEYOR SYSTEM
<br />7/21/2007
<br />N
<br />140,785.08
<br />101,717.34
<br />39,067.74
<br />PTC0000008
<br />CONVEYOR TRANSFER
<br />4/1/2015
<br />N
<br />136,104.40
<br />68,052.12
<br />68,052.28
<br />PTC0000010
<br />CONVEYOR
<br />3/27/1968
<br />N
<br />10,753.03
<br />9,916.88
<br />836.15
<br />PTC0000011
<br />MIX CONVEYOR SYSTEM
<br />4/1/2007
<br />N
<br />77,020.84
<br />51,347.23
<br />25,673.61
<br />PTC0000012
<br />MIX CONVEYOR SYSTEM
<br />4/1/2006
<br />U
<br />96,810.00
<br />76,802.76
<br />20,007.24
<br />PTC0000013
<br />CONVEYOR TRANSFER INCLINE
<br />5/29/2016
<br />N
<br />55,810.44
<br />21,459.78
<br />34,350.66
<br />PTC0000014
<br />CONVEYOR TRANSFER CROSSOVE
<br />3/16/2009
<br />U
<br />35,000.00
<br />23,100.00
<br />11,900.00
<br />PTC0000015
<br />CONVEYOR SILO
<br />3/16/2009
<br />U
<br />35,000.00,
<br />23,100.00
<br />11,900.00
<br />PTC0000016
<br />CONVEYOR SILO
<br />3/16/2009
<br />U
<br />35,000.00
<br />23,100.00
<br />11,900.00
<br />PTC0000017
<br />CONVEYOR TRANSFER
<br />11/22/1988
<br />N
<br />38,676.00
<br />33,880.96
<br />4,795.04
<br />PTC0000018
<br />CONVEYOR TRANSFER
<br />6/17/2017
<br />N
<br />84,709.68
<br />24,000.94
<br />60,708.74
<br />PTC0000019
<br />CONVEYOR SILO
<br />3/16/2009
<br />U
<br />22,000.00
<br />14,520.00
<br />7,480.00
<br />PTC0000020
<br />CONVEYOR SILO
<br />3/16/2009
<br />U
<br />28,000.00
<br />18,480.00
<br />9,520.00
<br />PTC0000021
<br />CONVEYOR SILO
<br />3/16/2009
<br />U
<br />22,000.00
<br />14,520.00
<br />7,480.00
<br />PTC0000022
<br />CONVEYOR SILO
<br />3/16/2009
<br />U
<br />23,000.00
<br />15,180.00
<br />7,820.00
<br />PTC0000023
<br />CONVEYOR SILO
<br />3/16/2009
<br />U
<br />29,000.00
<br />19,140.00
<br />9,860.00
<br />PTC0000024
<br />CONVEYORSILO
<br />3/16/2009
<br />U
<br />23,000.00
<br />15,180.00
<br />7,820.00
<br />PTC0000025
<br />CONVEYOR TRANSFER
<br />3/31/2005
<br />U
<br />6,660.00
<br />5,994.00
<br />666.00
<br />PTC0000026
<br />CONVEYOR TRANSFER SAND
<br />2/4/2003
<br />U
<br />9,300.00
<br />8,370.00
<br />930.00
<br />PTC0000027
<br />CONVEYOR TRANSFER
<br />7/1/2016
<br />U
<br />1,000.00
<br />191.58
<br />808.42
<br />PTS0000002
<br />TRUCK SCALE 8X10
<br />12/1/2018
<br />N
<br />61,850.00
<br />8,708.74
<br />53,141.26
<br />PTS0000003
<br />SCALE TRUCK
<br />4/29/2004
<br />N
<br />52,538.30
<br />52,538.30
<br />-
<br />PTS0000004
<br />SCALETRUCK
<br />5/30/2006
<br />U
<br />55,895.62
<br />51,858.63
<br />4,036.99
<br />PTS0000005
<br />SCALE TRUCK
<br />6/3/2006
<br />N
<br />85,663.88
<br />85,663.88
<br />-
<br />PTS0000006
<br />SCALETRUCK
<br />9/29/2008
<br />N
<br />17,000.00
<br />17,000.00
<br />-
<br />PTS0000007
<br />SCALE TRUCK SET UP
<br />12/14/2010
<br />U
<br />24,754.85
<br />24,754.85
<br />-
<br />PTS0000008
<br />SCALETRUCK
<br />5/8/1971
<br />N
<br />9,678.58
<br />8,925.96
<br />752.62
<br />PTS0000009
<br />SCALETRUCK
<br />2/4/1977
<br />N
<br />5,000.00
<br />4,500.00
<br />500.00
<br />PTS0000010
<br />SCALETRUCK
<br />4/21/1978
<br />N
<br />400,000.00
<br />400,000.00
<br />-
<br />PTS0000011
<br />SCALETRUCK
<br />7/8/1987
<br />N
<br />44,458.52
<br />40,012.67
<br />4,445.85
<br />PTS0000012
<br />SCALETRUCK
<br />7/21/2007
<br />N
<br />59,173.26
<br />42,752.79
<br />16,420.47
<br />PTS0000013
<br />SCALE TRUCK END SECTIONS (
<br />4/15/2010
<br />N
<br />50,865.86
<br />50,865.86
<br />-
<br />PTS0000014
<br />SCALE TRUCK 100 TON
<br />4/1/2016
<br />N
<br />57,160.19
<br />22,863.96
<br />34,296.23
<br />PTS0000015
<br />SCALE TRUCK
<br />8/9/1963
<br />N
<br />5,265.21
<br />4,855.79
<br />409.42
<br />PTS0000016
<br />SCALETRUCK
<br />4/16/1964
<br />N
<br />5,498.82
<br />5,071.24
<br />427.58
<br />PTS0000017
<br />SCALETRUCK
<br />9/4/1974
<br />N
<br />8,000.00
<br />7,200.00
<br />800.00
<br />PTS0000018
<br />SCALE UNDER SILO
<br />8/8/1986
<br />N
<br />82,916.71
<br />74,625.04
<br />8,291.67
<br />PTS0000019
<br />TRUCK SCALE
<br />9/21/2001
<br />N
<br />39,380.19
<br />39,380.19
<br />-
<br />PTS0000020
<br />SCALE TRUCK
<br />4/1/2007
<br />N
<br />21,363.14
<br />14,242.09
<br />7,121.05
<br />PTS0000021
<br />SCALE TRUCK
<br />2/25/2000
<br />N
<br />25,776.41
<br />23,198.77
<br />2,577.64
<br />PTS0000022
<br />SCALE TRUCK
<br />6/30/2008
<br />N
<br />22,510.00
<br />22,510.00
<br />-
<br />PTS0000023
<br />SCALE TRUCK 110'
<br />4/1/2016
<br />N
<br />60,756.58
<br />24,302.52
<br />36,454.06
<br />PTS0000025
<br />SCALE TRUCK
<br />4/28/2008
<br />N
<br />85,704.95
<br />85,704.95
<br />-
<br />PTS0000026
<br />SCALE TRUCK
<br />4/1/2006
<br />U
<br />48,110.00
<br />38,167.56
<br />9,942.44
<br />PTS0000027
<br />SCALE TRUCK SECTION 20 X 1
<br />4/1/2018
<br />N
<br />42,697.09
<br />8,539.44
<br />34,157.65
<br />PTS0000028
<br />SCALE TRUCK EXTENSION 20'
<br />4/1/2017
<br />N
<br />30,672.62
<br />9,201.84
<br />21,470.78
<br />PTS0000029
<br />SCALETRUCK
<br />3/16/2009
<br />U
<br />34,000.00
<br />22,440.00
<br />11,560.00
<br />PT50000030
<br />SCALE TRUCK
<br />3/16/2009
<br />U
<br />34,000.00
<br />22,440.00
<br />11,560.00
<br />
|