Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Ignition Park: EV Charging Park <br />Project Number: 120-044R <br />For Bids Due: April 13, 2021 at 9:00am Local Time <br />Contractor Name: Rieth Riley Construction Co., Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LSUM <br />$10,000.00 <br />$10,000.00 <br />2 <br />CONCRETE CURB & GUTTER REMOVAL <br />175 <br />LFT <br />$18.17 <br />$3,179.75 <br />3 <br />EARTHWORK <br />1775 <br />CYD <br />$26.70 <br />$47,392.50 <br />4 <br />COMMON EXCAVATION <br />720 <br />CYD <br />$26.55 <br />$19,116.00 <br />5 <br />HMA INTERMEDIATE, TYPE B <br />280 <br />TON <br />$84.19 <br />$23,573.20 <br />6 <br />HMA SURFACE, TYPE B <br />140 <br />TON <br />$117.47 <br />$16,445.80 <br />7 <br />COMPATCTED AGGREGATE, No. 53 <br />550 <br />CYD <br />$53.63 <br />$29,496.50 <br />8 <br />PCCP FOR APPROACH, REINFORCED <br />120 <br />SYD <br />$59.83 <br />$7,179.60 <br />9 <br />SIDEWALK, CONCRETE, 4" <br />715 <br />SYD <br />$38.37 <br />$27.1434.55 <br />10 <br />CURB RAMP, CONCRETE <br />16 <br />SYD <br />$222.11 <br />$3,553.76 <br />11 <br />CONCRETE CURB <br />1100 <br />LFT <br />$26.09 <br />$281699.00 <br />12 <br />CURB TURNOUT <br />7 <br />EA <br />$641.20 <br />$4,488.40 <br />13 <br />CONCRETE PARKING STOP <br />15 <br />EA <br />$85.00 <br />$1,275.00 <br />14 <br />STORM SEWER PIPE, 12 IN <br />80 <br />LFT <br />$82.79 <br />$6,623.20 <br />15 <br />STORM CASTING REPLACEMENT <br />1 <br />EA <br />$1,253.07 <br />$1,253.07 <br />16 <br />TESCO CABINET, FOUNDATION, WIRING, <br />ETC <br />1 <br />EA <br />$19,500.00 <br />$19,500.00 <br />17 <br />ELECTRICAL SERVICE CONNECTION <br />1 <br />LSUM <br />$1,750.00 <br />$1,750.00 <br />18 <br />LIGHT STANDARD, TYPE A <br />1 <br />EA <br />$4,300.00 <br />$4,300.00 <br />19 <br />LIGHT STANDARD, TYPE B <br />1 <br />EA <br />$3,500.00 <br />$3,500.00 <br />20 <br />LIGHT POLE FOUNDATION <br />2 <br />EA <br />$1,000.00 <br />$2,000.00 <br />21 <br />EV CHARGING FOUNDATION (18"x18"X1811) <br />7 <br />EA <br />$600.00 <br />$4,200.00 <br />22 <br />LIGHTING CONDUIT, PVC, SCH 80,3 IN <br />270 <br />LFT <br />$9.75 <br />$2,632.50 <br />23 <br />LIGHTING CONDUIT, PVC, SCH 80,3 IN, <br />DIRECTION DRILL <br />50 <br />LFT <br />$25.00 <br />$1,250.00 <br />24 <br />EV CHARGING CONDUIT, PVC SCH 40,3 IN <br />375 <br />LFT <br />$9.75 <br />$3,656.25 <br />25 <br />LIGHTING WIRING <br />360 <br />LFT <br />$9.00 <br />$3,240.00 <br />26 <br />ELECTRIC PULL BOX <br />5 <br />EA <br />$650.00 <br />$3,250.00 <br />27 <br />THERMOPLASTIC LINE, SOLID, WHITE, 6 IN <br />110 <br />LFT <br />$3.95 <br />$434.50 <br />28 <br />THERMOPLASTIC LINE, SOLID, YELLOW, 41N <br />530 <br />LFT <br />$2.05 <br />$1,086.50 <br />Version 01/13/2021 Contractor's Bid for Public Works -7 <br />