My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2021 Street and Sewer Materials Bid Proj No. 121-018 - Rieth-Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Bids
>
Opening of Bids - 2021 Street and Sewer Materials Bid Proj No. 121-018 - Rieth-Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 4:05:01 PM
Creation date
4/14/2021 4:02:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2021 Street and Sewer Material Bid <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />121-018 <br />ARril 13, 2021, 9:00 a.m., Local Time <br />DIVISION B - AGGREGATE MATERIALS — CONT' <br />B-6 No. 11 Slag Chip Stone 1000 TON t 2 1. <br />2--- <br />DIVISION C - SEWER MATERIALS - CASTINGS <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />C-1 <br />Manhole Cover and Frame: EJ 1040A or Neenah R- <br />1642 One) <br />300 <br />EA <br />v �; <br />(Circle <br />C-2 <br />Catch Basin Cover & Frame: EJ 1020-M 1 or Neenah <br />300 <br />EA <br />R-1642 (Circle One) <br />DIVISION D - SEWER MATERIALS <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />D-1 <br />MH Riser 20 3/4" D —1 "R — 7/8"L <br />40 <br />EAN,�y <br />D-2 <br />MH Riser 20 3/4" D -1 1/2"R — 7/8"L <br />40 <br />EA <br />D-3 <br />MH Riser 20 3/4" D — 2"R — 7/8"L <br />20 <br />EA <br />D-4 <br />MH Riser 20 3/4" D — 2 1/2"R — 7/8"L <br />10 <br />EA <br />D-5 <br />MH Riser 21 3/4" D —1 "R — 1 3/8"L <br />20 <br />EA <br />D-6 <br />MH Riser 21 3/4" D —1 1/2"R —1 3/8"L <br />30 <br />EA <br />D-7 <br />MH Riser 21 3/4" D — 2"R — 1 3/8"L <br />30 <br />EA <br />D-8 <br />MH Riser 22 1 /8" D— 2"R — 1 1 /4"L <br />20 <br />EA <br />D-9 <br />MH Riser 22 1 /8" D— 3"R — 1 1 /4"L <br />5 <br />EA <br />Version 01/13/2021 Contractor's Bid for Public Works - 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.