My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2021 Street and Sewer Materials Bid Proj No. 121-018 - Milestone Contractors North, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Bids
>
Opening of Bids - 2021 Street and Sewer Materials Bid Proj No. 121-018 - Milestone Contractors North, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 4:02:02 PM
Creation date
4/14/2021 4:00:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. List references from private firms for which you have performed work. <br />Gatlin Plumbing & Heating, Inc. 1111 E. Main St., Griffith IN Ms. Clara Murphy <br />Goup,li. Inc. 2200 E. 88' Dr., Merrillville IN 46410 Mr. Ra and Gough <br />Dyer Construction Co. 1716 Sheffield Avenue er, IN Janet Furman <br />Grimmer Construction Co., Inc. 2619 Main Street, Highland, IN Mr. Greg Grimmer <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br />Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could <br />begin work, completed the project, number of workers, etc. and any other information which you believe would <br />enable the governmental unit consider your bid.) <br />As required by owner <br />Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have <br />performed part of the work) that you have used on public works projects during the past five (5) years along with a <br />brief description of the work done by each subcontractor. <br />See Attached List <br />If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be <br />used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a <br />listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed <br />project, you are under a continuing obligation to immediately notify the governmental unit in the event that you <br />subsequently determine that you will use a subcontractor on the proposed project. <br />Will supply upon award of contract <br />QUANTITY <br />ITEM <br />DESCRIPTION, <br />SIZE, CAPACITY, <br />ETC. <br />CONDITION <br />YEARS <br />OF <br />SERVICE <br />PRESENT LOCATION <br />5 <br />Asphalt Plants <br />Various <br />Good <br />Griffith, South Bend, <br />Valparaiso, Lowell, LaPorte <br />19 <br />Asphalt Pavers <br />Various <br />Good <br />Griffith, South Bend <br />4 <br />Sli form Conc. Paver <br />Various <br />Good <br />Griffith, South Bend <br />3 <br />Road Widener <br />Various <br />Good <br />Griffith, South Bend <br />5 <br />Motor Graders <br />CAT/J.D. <br />Good <br />Griffith, South Bend <br />56 <br />Rollers <br />Various <br />Good <br />Griffith, South Bend <br />36 <br />Rubber Tire Loaders <br />Various <br />Good <br />Griffith, South Bend <br />18 <br />Excavators <br />Various <br />Good <br />Griffith South Bend <br />9 <br />Bulldozers <br />Various <br />Good <br />Griffith, South Bend <br />7 <br />LowBoy Tractors <br />Various <br />Good <br />Griffith, South Bend <br />9 <br />Flatbed Dumps <br />Various <br />Good <br />Griffith, South Bend <br />54 <br />'/2 and 3/ ton Pickups <br />Various <br />Good <br />Griffith, South Bend <br />78 <br />1 Ton Crew Trucks <br />Various <br />Good <br />Griffith, South Bend <br />3 <br />Cold Planers <br />Wirtgen 1900 <br />DC <br />Good <br />Griffith, South Bend <br />72 <br />1 Tri-Axle Dump <br />Mack <br />Good <br />Griffith, South Bend <br />4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors <br />may also be required to be listed by the governmental unit. <br />5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing <br />your proposal? Otherwise, please explain the rationale used which would corroborate the prices listed. <br />Yes, we received quotes from potential subcontractors and suppliers <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.