My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2021 Street and Sewer Materials Bid Proj No. 121-018 - Ferguson Waterworks
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Bids
>
Opening of Bids - 2021 Street and Sewer Materials Bid Proj No. 121-018 - Ferguson Waterworks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2021 3:59:29 PM
Creation date
4/14/2021 3:58:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/13/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. High Build Fast Dry Waterborne Traffic Paint must be environmentally friendly 100% <br />acrylic emulsion traffic paint containing less than 100 grams per liter volatile organic <br />content (VOC). <br />c. High Build Fast Dry Waterborne Traffic Paint must meet or exceed TT-P-1952F <br />Type III when tested in accordance with the following ASTM test methods: D236% <br />D5622 D26971 D37233 D2805, D7113 D12109 D9693 D1849, D5223 D22433 D17295 <br />D9681 D24861 D1394, D16403 D22443 D33353 D37183 E13473 G154. <br />d. Coverage is to be 320 ft. of 4-inch line per gallon at 30 mils wet film thickness. <br />Precautions: Both surface and ambient application temperatures shall be a <br />minimum of 50°F. Temperature shall not drop below 50°F within a 24-hour period <br />following application. The shelf life of the paint shall be a minimum of 12 months. <br />e. The paint shall dry to a no tracking condition in no more than 6 minutes. The no <br />tracking condition shall be determined by actual application on the pavement at a <br />wet film thickness of 30 mils (750 pm) or greater with white or yellow paint covered <br />with glass beads at a rate of 7 lb/gal, (0.7 kg/L). <br />2. Standard Pavement Marking Beads shall be in accordance with INDOT Specification <br />Section 921, <br />3. Material must be provided in 55-gallon drums. <br />4. Paint shall be Ennis -Flint High Build Fast Dry Waterborne Traffic Paint or an approved <br />equal. Specifications shall be submitted to both the Engineer and Manager of Traffic <br />and Lighting for approval. <br />XX. DIVISION F: SNOW REMOVAL MATERIALS <br />B. Prevailing specifications/INDOT Standard Specification Section: None <br />C. Additions: <br />1. This specification covers requirements for replaceable cutting -edge blades for motor <br />graders and underbody truck scrapers. <br />2. Material: <br />a. The cutting edges shall be formed from high carbon <br />steel <br />made by the <br />open hearth, <br />basic oxygen, or electric furnace process and shall <br />have <br />the following <br />composition. <br />bI The composition of steel shall be as follows: <br />-High <br />Carbon <br />Heat Treated <br />Com osition <br />Min % <br />Max % <br />Com osition <br />Min % <br />Max <br />Carbon <br />0,80 <br />1,00 <br />Carbon <br />0,25 <br />0.35 <br />Manganese <br />0,50 <br />0,90 <br />Manganese <br />0,75 <br />1.20 <br />Phosphorous <br />0,05 <br />Phosphorous <br />0,05 <br />Sulfur <br />0,05 <br />Sulfur <br />0,05 <br />Silicon <br />0,35 <br />Silicon <br />0,10 <br />0,40 <br />Boron <br />0,0005 <br />0,0085 <br />Version 1/30/2020 Special Provisions - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.