Laserfiche WebLink
MEETING REPORT <br />Central High School <br />Attendees: Roger Hulsey, Troyer Group <br />Lynette Jentoft-Nilsen, Director-HPC <br />Brian Poland, Administrative Assn't.-HPC <br />Janeanne Petrass, HPC member <br />An informal meeting was held on November 1, 1988 at the request of Roger <br />Hulsey. <br />1) A schematic drawing of the new west entrance was presented to <br />determine if the design approach was appropriate. In general, the <br />entrance will reuse the stone arch from the Vocational Building, a <br />window section, and the pilaster capitals. Brick from both the <br />Vocational Building and Boilerhouse will also be used. The symetrical <br />design will include panels interpreting the two removed buildings and <br />will be connected to the High School Building by a structural glass <br />enclosure. <br />2) A second topic was the windows. The architect contends that the <br />existing windows need to be replaced. Local suppliers have been contacted, <br />but there appears to be some difficulty in finding a company to replicate <br />the sashes. Pella Windows has been contacted but is unable to match the <br />6' to 7' height dimension of the upper sashes. They can only manufacture <br />a 5' sash. The HPC staff, in responding to the question, deemed that <br />changing the sash sizes would be inappropriate. The Pella product is an <br />aluminum exterior material attached to wood interior in accordance to the <br />school corporation's desire for a "maintenance free" product. <br />The staff presented brochures from various window companies for the <br />architect to investigate and also requested that the architect provide <br />a window schedule describing the condition of a random sampling of <br />the windows. <br />