My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
November 1988
sbend
>
Public
>
Historic Preservation
>
Meeting Minutes
>
HPC Meeting Minutes 1988
>
November 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 3:20:34 PM
Creation date
3/26/2021 4:06:32 PM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Minutes
HPC Document Description
HPC Meeting Minutes
BOLT Control Number
1001757
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEETING REPORT <br />Central High School <br />Attendees: Roger Hulsey, Troyer Group <br />Lynette Jentoft-Nilsen, Director-HPC <br />Brian Poland, Administrative Assn't.-HPC <br />Janeanne Petrass, HPC member <br />An informal meeting was held on November 1, 1988 at the request of Roger <br />Hulsey. <br />1) A schematic drawing of the new west entrance was presented to <br />determine if the design approach was appropriate. In general, the <br />entrance will reuse the stone arch from the Vocational Building, a <br />window section, and the pilaster capitals. Brick from both the <br />Vocational Building and Boilerhouse will also be used. The symetrical <br />design will include panels interpreting the two removed buildings and <br />will be connected to the High School Building by a structural glass <br />enclosure. <br />2) A second topic was the windows. The architect contends that the <br />existing windows need to be replaced. Local suppliers have been contacted, <br />but there appears to be some difficulty in finding a company to replicate <br />the sashes. Pella Windows has been contacted but is unable to match the <br />6' to 7' height dimension of the upper sashes. They can only manufacture <br />a 5' sash. The HPC staff, in responding to the question, deemed that <br />changing the sash sizes would be inappropriate. The Pella product is an <br />aluminum exterior material attached to wood interior in accordance to the <br />school corporation's desire for a "maintenance free" product. <br />The staff presented brochures from various window companies for the <br />architect to investigate and also requested that the architect provide <br />a window schedule describing the condition of a random sampling of <br />the windows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.