Laserfiche WebLink
<br /> <br />Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of 4 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated October 27, 2020. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. __1___ <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />October 27, 2020 <br /> <br />b. <br /> <br />Owner: <br /> <br />City of South Bend, Indiana <br /> <br />c. <br /> <br />Engineer: <br /> <br />Black & Veatch Corporation <br /> <br />d. <br /> <br />Project: <br /> <br />Water Hydraulic Modeling Assistance <br /> <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />Task 104 – Project Management and Administration <br />Engineer will provide project administration and management including budget and <br />schedule control for the addition of Amendment 1. <br />Task 105 – Maximum Day Model Scenario Update <br />Due to recent improvement projects completed at a number of water treatment plants, <br />the Owner would like to update their hydraulic model to reflect the current maximum <br />day demand (MDD) operations. <br />Engineer will review the appropriate SCADA data, production data, and/or other <br />operational information provided by the Owner to determine the typical MDD <br />operations. A teleconference with the Owner’s staff will be held and one representative <br />MDD operational scenario will be agreed upon. Changes will be made to the <br />operational controls within the model to reflect the selected MDD scenario. If necessary, <br />demands in the model may be adjusted to reflect the selected MDD by adding a global <br />multiplier. Engineer does not anticipate that demand allocation will require updates. <br />A full model calibration to SCADA data is not included. The anticipated changes to the <br />model are operational adjustments therefore recalibration is not required at this time. <br />Updates to the MDD scenario will be summarized and documented in a brief <br />memorandum that will be provided to the Owner.