Laserfiche WebLink
Page 2 of 2 <br />Alternate No. 4 <br />Bidder Amount <br />1. Walsh & Kelly, Inc.$30,256.00 <br />2. Rieth-Riley Construction Co., Inc.$33,114.00 <br />3. LaPorte Construction Co., Inc.$33,472.00 <br />4. Premium Concrete, Inc.$33,936.00 <br />Engineering would like to note that a discrepancy was found in the bid forms for Walsh & Kelly, <br />Inc. and Premium Concrete, Inc. that was corrected in the bid tab. In the addendum, the <br />quantity for line item 27 – Tree Watering System was changed from 8 to 9. Both Walsh & Kelly <br />and Premium Concrete, Inc. used the original bid form, with the quantity of 8. It was confirmed <br />with both contractors that the intent of the bid was to apply the unit price in the bid to a quantity <br />of 9. Email confirmation from both contractors is included with this memo, and the total amounts <br />were corrected in the bid tab. <br />I recommend award of a contract for the Base Bid to the lowest responsive / responsible bidder, <br />Walsh & Kelly Inc. in the amount of $222,079.50. <br />Sufficient funds have been appropriated from TIF – Southside Development #1, 430-10-102-121- <br />442001-PROJ00000216. <br />Please call with your questions. <br />Enc. Bid Tabulation