Laserfiche WebLink
Version 2/14/2020 Page - 6 Public Works Quote <br />(i) Quote shall include cost to adjust any rim elevations at any existing drainage structures, <br />as needed, to ensure positive drainage to all existing drainage structures <br />b. Quote should include any necessary patching after the milling operation is complete <br />(i) Assume 10% of the parking areas will need further patching <br />c. Place a tack coat between old and new asphalt as per City and INDOT standards <br />(i) Include tack coat for any patching areas as well <br />d. Place a 1.5” lift of surface asphalt, adhering to City and INDOT standards for hot mix asphalt <br />(non QA/QC) <br />e. Re-stripe parking areas, including handicapped spots and gore areas as necessary <br />(i) Site visit with Building Manager will be coordinated with winning quote to determine final <br />striping layout <br />2. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations.