Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND h <br />Project Name: Mayflower Road and Sample Street Traffic Improvements <br />Project Number: 120-052 <br />For Bids Due: March 23, 2021 <br />Contractor Name: Rieth-Riley Construction Co., Inc <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Mobilization/Demobilization <br />1 <br />LS <br />$32,100.70 <br />$32,100.70 <br />2. <br />Construction Engineering <br />1 <br />LS <br />$8,500.00 <br />$8,500.00 <br />3. <br />Clearing Right of Way <br />1 <br />LS <br />$19,500.00 <br />$19,500.00 <br />4. <br />Concrete Curb, Remove <br />368 <br />LFT <br />$29.00 <br />$10,672.00 <br />5. <br />Pavement, Remove <br />125 <br />SYD <br />$21.00 <br />$2,625.00 <br />6. <br />Signal Pole and Foundation, Remove <br />2 <br />EACH <br />$900.00 <br />$1,800.00 <br />7. <br />Maintenance of Traffic <br />1 <br />LS <br />$26,000.00 <br />$26,000.00 <br />8. <br />Traffic Signal Equipment, Remove and Salvage <br />1 <br />LS <br />$900.00 <br />$900.00 <br />9. <br />Common Excavation <br />1 <br />LS <br />$10,500.00 <br />$10,500.00 <br />10. <br />Temporary Erosion and Sediment Control <br />1 <br />LS <br />$2,500.00 <br />$2,500.00 <br />11. <br />Pavement Milling, 1.5" <br />442 <br />SYD <br />$24.00 <br />$10,608.00 <br />12. <br />HMA Surface, 9.5 mm, Type B <br />345 <br />TON <br />$140.00 <br />$48,300.00 <br />13. <br />HMA Intermediate, 19.0 mm, Type B <br />40 <br />TON <br />$140.00 <br />$5,600.00 <br />14. <br />HMA Base, 25.0 mm, Type B <br />120 <br />TON <br />$140.00 <br />$16,800.00 <br />15. <br />Concrete Curb <br />332 <br />LFT <br />$31.00 <br />$10,292.00 <br />16. <br />Concrete for Driveway, 6" <br />24 <br />SYD <br />$100.00 <br />$2,400.00 <br />17. <br />Drywell, 1200 Gal. <br />2 <br />EACH <br />$9,500.00 <br />$19,000.00 <br />18. <br />Catch Basin <br />1 <br />EACH <br />$3,500.00 <br />$3,500.00 <br />19. <br />Storm Pipe, 12" <br />20 <br />LFT <br />$50.00 <br />$1,000.00 <br />20. <br />Adjust Casting to Grade <br />2 <br />EACH <br />$600.00 <br />$1,200.00 <br />21. <br />Adjust Valve Box to Grade <br />2 <br />EACH <br />$400.00 <br />$800.00 <br />22. <br />Controller, TS -2 Cabinet and P1 Foundation <br />1 <br />EACH <br />$20,000.00 <br />$20,000.00 <br />Version 01/13/2021 Contractor's Bid for Public Works - 7 <br />