Laserfiche WebLink
Page 1 of 3 <br />ITEMUNIT <br />NO. <br />QTY <br />UNIT <br />DESCRIPTION <br />COST <br />TOTAL COST <br />1 <br />1.00 <br />LS <br />Mobilization/Demobilization <br />16,500.00 <br />16,500.00 <br />2 <br />1.00 <br />LS <br />Construction Engineering <br />6,000.00 <br />6,000.00 <br />3 <br />1.00 <br />LS <br />Clearing Right of Way <br />3,300.00 <br />3,300.00 <br />4 <br />368.00 <br />LFT <br />Concrete Curb, Remove <br />19.00 <br />6,992.00 <br />5 <br />125.00 <br />SYD <br />Pavement, Remove <br />19.00 <br />2,375.00 <br />6 <br />2.00 <br />Each <br />Signal Pole and Foundation, Remove <br />500.00 <br />1,000.00 <br />7 <br />1.00 <br />LS <br />Maintaining Traffic <br />8,600.00 <br />8,600.00 <br />8 <br />1.00 <br />LS <br />Traffic Signal Equipment, Remove and Salvage <br />1,000.00 <br />1,000.00 <br />9 <br />1.00 <br />LS <br />Common Excavation <br />18,000.00 <br />18,000.00 <br />10 <br />1.00 <br />LS <br />Temporary Erosion and Sediment Control <br />7,000.00 <br />7,000.00 <br />11 <br />442.00 <br />SYD <br />Pavement Milling, 1.5" <br />27.00 <br />11,934.00 <br />12 <br />345.00 <br />Ton <br />HMA Surface, 9.4 mm, Type B <br />100.50 <br />34,672.50 <br />13 <br />40.00 <br />Ton <br />HMA Intermediate, 19.00 mm, Type B <br />135.00 <br />5,400.00 <br />14 <br />120.00 <br />Ton <br />HMA Base, 25.0 mm, Type B <br />71.00 <br />8,520.00 <br />15 <br />332.00 <br />LFT <br />Concrete Curb <br />49.00 <br />16,268.00 <br />16 <br />24.00 <br />SYD <br />Concrete For Driveway, 6" <br />135.00 <br />3,240.00 <br />17 <br />2.00 <br />Each <br />Drywell, 1200 Gal. <br />7,020.00 <br />14,040.00 <br />18 <br />1.00 <br />Each <br />Catch Basin <br />2,700.00 <br />2,700.00 <br />19 <br />20.00 <br />LFT <br />Storm Pipe, 12" <br />108.00 <br />2,160.00 <br />20 <br />2.00 <br />Each <br />Adjust Casting to Grade <br />540.00 <br />1,080.00 <br />21 <br />2.00 <br />Each <br />Adjust Valve Box to Grade <br />27.00 <br />54.00 <br />22 <br />1.00 <br />Each <br />Controller, TS -2 Cabinet and P1 Foundation <br />22,000.00 <br />22,000.00 <br />