Laserfiche WebLink
Auten Connector Annexation Area _ 5 <br />K. Hiring Plan <br />It is anticipated that this annexation will not result in the elimination of jobs for <br />employees of any other governmental entities. The German Township Trustee has <br />been notified of this Annexation. <br />SECTION III. MUNICIPAL SERVICES <br />A. Public Works <br />Sewer -Currently, there is no sanitary sewer on any boundary of this site. A sanitary <br />sewer plan for this and surrounding areas is under study, but has not yet been adopted. <br />Sewer services will be constructed and provided when the road is developed. <br />Water -The South Bend Water Works currently has a 12" water main on the west <br />side of Mayflower Road that is looped at Brick and Adams Road. There should be more <br />than adequate capacity for the annexation area. Water services will be provided to <br />adjacent areas of the roadway when the road is constructed. <br />Extensions of, or taps into sanitary sewer and water lines shall be governed by <br />I.C. 36-9-22-2, I.C. 8-1.5-3 and 4, and the rules and regulations of the South Bend <br />Water Works and Sewer Utility. <br />Streets -Currently, there are no public improvements in the annexation area. The full <br />array of improvements wil{ be extended with the proposed roadway for future service to <br />adjacent areas. Water and sewer services will be constructed with the roadway at an <br />estimated cost of 1.3 Million Dollars per lane-mile. The roadway is expected to be a four <br />lane boulevard and approximately 10,250 feet long. <br />Waivers of Annexation - No waivers of annexation are in effect for the Annexation <br />Area. <br />Public Work General Budget Analysis* <br />2008 Actual Budget Report for the Department: <br />Expenditures: <br />Miles of Roadway in City: <br />Cost per Mile: <br />Immediate New Mileage within Area: <br />Immediate Estimated Maintenance cost <br />for Annexation Area per year: <br />Proposed New Mileage within Area: <br />Estimated Maintenance cost <br />For Proposed Roadway: <br />$6,303,240 <br />@480 <br />@$13,131.75 <br />@0.00 miles (0 feet) <br />@$0.00 <br />@ 0.27 Miles (1,447.2 feet) <br />@ 3,545.57 <br />*The above calculation only pertains to the length on the new roadway in this phase <br />of the annexation. <br />