My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - El Campito Water Tap Quote Proj No. 121-017 - Niezgodski Plumbing Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Quotes - El Campito Water Tap Quote Proj No. 121-017 - Niezgodski Plumbing Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 2:22:36 PM
Creation date
3/9/2021 2:18:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. If tree roots are encountered and must be removed due to grades, the contractor shall contact a <br />representative from the City of South Bend Engineering Division. Tree roots shall not be removed <br />without the on-site approval of the Engineer. The cost of root removal shall not be paid for <br />separately but shall be included on the cost of other items. <br />8. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />Parking Lane and Concrete Header, Remove and Replace ................... SY <br />XXIII. WATER SERVICE, 2" TYPE K COPPER <br />A. Prevailing Specifications: City of South Bend Standards, Section 5 Water Works <br />B. Additions <br />1. Water service pipe and fittings shall be Type "K" Copper Pipe. <br />2. All curb valves and boxes will be located in the parking lane. <br />3. The service shall include the copper, corporation stop curb and valve. Curb box shall be provided <br />by City. <br />4. The Contractor shall be responsible for coordination with South Bend Water Works and all <br />tapping requirements per City of South Bend Standard 5-1, see Appendix B. <br />5. The cost of work for excavation, backfill, compact aggregate, compacting, leveling and grading <br />shall not be paid separately but included in the cost of Water Service. Ali work shall be done <br />according to City of South Bend Standard 2-49, see Appendix B. <br />6. Payment shall be made at the Unit Price as specified in the Proposal as follows: <br />Water Service 11" Type K Copper .......... LFT <br />XXIV. WATER METER PIT <br />A. Prevailing Specifications: City of South Bend Standards, Section 5 Water Works <br />B. Additions <br />1. Water Meter Pit shall be according to City of South Bend Standard 5-13, see Appendix B. <br />2. The pay item Water Meter Pit shall include all labor and materials to provide fully functional water <br />meter pit with 48" casting, water meter, piping, valves and backflow preventor. Backflow preventor <br />should include a vandal cover with padlock system. <br />3. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />Water Meter Pit ................... EA <br />XXV. "B" BORROW (ALTERNATE) <br />A. Prevailing Specifications: 2420, INDOT Standard Specifications Section 211 <br />B. Additions <br />1- The Contractor shall furnish all necessary equipment, labor, and materials to complete backfill of <br />excavations with "B" Borrow material if excavated material is determined to be unsatisfactory for <br />backfill by the Engineer. It is anticipated that native material will be acceptablefor backfill. No topsoil <br />or organic material will be allowed to be used as backfill. <br />2. The actual quantity of "B" Borrow completed and accepted will be measured for payment at the unit <br />cost set forth in the proposal. <br />3. Payment shall be made at the Unit Price as specified in the Proposal as follows. <br />"B" Borrow .......... CY <br />XXVI. EXHIBITS <br />A. Prevailing Specifications: City of South Bend CONSTRUCTION STANDARDS AND SPECIFICATIONS <br />B. Additions: <br />1. The exhibits consist of 12 Sheets in total, including appendix fly sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br />C. Appendices: <br />1. Appendix A —Displays showing new water service plan, as-buiits, and reference photos (3 Sheets) <br />2. Appendix B — City of South Bend Standard Drawings 2-49, 5-1 — 5-3, and 5-13 (5 Sheets) <br />3. Appendix C — Traffic Control and Occupancy Request Form (1 Sheet) <br />Version 2/14/2020 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.