My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - El Campito Water Tap Quote Proj No. 121-017 - Niezgodski Plumbing Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Quotes - El Campito Water Tap Quote Proj No. 121-017 - Niezgodski Plumbing Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 2:22:36 PM
Creation date
3/9/2021 2:18:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date: March 4, 2021 <br />To: All Plan Holders <br />EL CAMPITO WATER TAP QUOTE <br />121-417 <br />ADDENDUM NO. 1 <br />From: Alicia Pellegrino, Project Engineer <br />The following information is to be changed/added to the contract documents: <br />XXIII. WATER SERVICE 2" TYPE K COPPER <br />v: ai::in,g :. e `,„G:i;: s: City of South Bend Standards, Sectior, 5 lAater Works <br />B. Additions <br />1. Water service pipe and fittings shall be Type '1K” Copper Pipe, <br />2. All curb valves and boxes, will be located in the parking lane. <br />3, The servic-- shall include the copper, corporation stop curb and valve. Curb box shell be <br />�rovlded icy City. <br />4. The Contractor shall be responsible for coordination wtiii South Bend Nater Works and <br />all tapping requirementsper City of South Send Standard 5-1, see Appendix B. <br />5. The cost of work for excavation: backfill, compact aggregate. compacting, leveling and <br />grading shall not he palri ser,arate!y b:it included in the- cost of Water Service. All work shall <br />Ue do a ,.1.- . <br />6. Payment shall be made at the Unit Price as specified in the Proposal as follows: <br />Water Service 2" Type K Copper .......... LFT <br />XXIV. WATER METER PIT <br />.. v -J( I:II i -J UIL Zir SVU..M Qu1IU JLGi IUQIU�, JG1+[it13i J VV"CJLGI Y-1- <br />B. Addlbons Y <br />1. Vt'ater ItlRtpr Pit shall be r-+th Bend Standard 5-13. see Appe+�clix B. <br />2. The pay item Water Meter Pit shall include all labor and materials to provide fully functional <br />water meter pit with 48" casting, water meter, piping, valves, backflow preventor, and frost <br />free yard hydrant. Backflow preventor should include a vandal cover with padlock system. <br />Backflow preventor shall be a pressure vacuum breaker outside the pit above grade on the <br />outlet side of the meter pit. The line shall include a frost free yard hydrant as the terminus. <br />The Contractor shall provide a one time winterizing of the system. <br />3. The Contractor shall coordinate with the City Inspector on exact locations of meter pit, <br />backflow preventor, and frost free yard hydrant. <br />4. Payment shall be made at the Unit Price specified in the Proposal as follows: <br />Water Meter Pit. .................. EA <br />Attachments: <br />Revised Appendix A Display 1 <br />-This addendum consists of a total 3 pages inclusive of "Acknowledgement of Receipt of <br />Addendum" sheet - <br />Version 4/2/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.