My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - El Campito Water Tap Quote Proj No. 121-017 - Niezgodski Plumbing Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Opening of Quotations/Proposals
>
Opening of Quotes - El Campito Water Tap Quote Proj No. 121-017 - Niezgodski Plumbing Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 2:22:36 PM
Creation date
3/9/2021 2:18:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5 - WATER WORKS <br />�f <br />E I <br />I I <br />I I <br />H304 Stainless E <br />Steel Tapping <br />sleeve <br />Tapping Valve ` <br />New Main <br />o a <br />0 0 <br />I <br />o a <br />Restrain With wedge Flanged ]oint J <br />Action Restraints <br />I I <br />I I <br />Ex. Main <br />TAP MADE UNDER PRESSURE (WET TAP) <br />CONNECTING NEW MAIN TO EXISTING MAIN <br />61 <br />= No. <br />DOTES: <br />_ • = PE108095I0 • <br />1. Tapping valves shall be Clow, Mueller, or approved equal. <br />2. The physical tapping of the existing water main shall be performed by the city's utility <br />= p 1 A TE OF _' <br />distribution department. All excavation and preparation work shall be performed by <br />the all materials. The utility will only <br />�S " %�� D I <br />the contractor, and contractor shall provide <br />()��L <br />perform the physical tap. Contractor shall coordinate with the Water Department. <br />,//jlrrrr l , i,i `� <br />t • 6/26/1 <br />REF STD SPEC SEC 5-2.5(e) <br />Kara . i3oyle , P .D., P.E. Date <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />EFFECTIVE DATE: June 26, 2018 <br />T <br />. <br />CITY OF SOUTH BEND <br />Item Revision Approved Date <br />�z <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />STANDARD <br />TAPPING SLEEVE AND VALVE <br />1 5-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.