Laserfiche WebLink
SECTION 5 - WATER WORKS <br />�f <br />E I <br />I I <br />I I <br />H304 Stainless E <br />Steel Tapping <br />sleeve <br />Tapping Valve ` <br />New Main <br />o a <br />0 0 <br />I <br />o a <br />Restrain With wedge Flanged ]oint J <br />Action Restraints <br />I I <br />I I <br />Ex. Main <br />TAP MADE UNDER PRESSURE (WET TAP) <br />CONNECTING NEW MAIN TO EXISTING MAIN <br />61 <br />= No. <br />DOTES: <br />_ • = PE108095I0 • <br />1. Tapping valves shall be Clow, Mueller, or approved equal. <br />2. The physical tapping of the existing water main shall be performed by the city's utility <br />= p 1 A TE OF _' <br />distribution department. All excavation and preparation work shall be performed by <br />the all materials. The utility will only <br />�S " %�� D I <br />the contractor, and contractor shall provide <br />()��L <br />perform the physical tap. Contractor shall coordinate with the Water Department. <br />,//jlrrrr l , i,i `� <br />t • 6/26/1 <br />REF STD SPEC SEC 5-2.5(e) <br />Kara . i3oyle , P .D., P.E. Date <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />EFFECTIVE DATE: June 26, 2018 <br />T <br />. <br />CITY OF SOUTH BEND <br />Item Revision Approved Date <br />�z <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />STANDARD <br />TAPPING SLEEVE AND VALVE <br />1 5-2 <br />