Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SQUTH BEND <br />Project Name: Ignition Park: EV Charging Park <br />Project Number: 120-044 <br />For Bids Due: -March 9, 2021 at Mg -am Local Time <br />Contractor Name: —Rieth-Riley Construction Co Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LSUM <br />$3,125.00 <br />$3,125.00 <br />2 <br />CONCRETE CURB & GUTTER REMOVAL <br />175 <br />LFT <br />$17.16 <br />$3,003.00 <br />3 <br />EARTHWORK <br />1,775 <br />CYD <br />$25.01 <br />$44,392.72 <br />4 <br />COMMON EXCAVATION <br />720 <br />CYD <br />$24.86 <br />$17,199.20 <br />5 <br />HMA INTERMEDIATE, TYPE B <br />280 <br />TON <br />$78.55 <br />$21,994.00 <br />6 <br />HMA SURFACE, TYPE B <br />140 <br />TON <br />$109.60 <br />$15,344.00 <br />7 <br />COMPATCTED AGGREGATE, No. 53 <br />550 <br />CYD <br />$50-15 <br />$27,582.50 <br />8 <br />PCCP FOR APPROACH, REINFORCED <br />120 <br />SYD <br />$55.82 <br />$6,698.40 <br />9 <br />SIDEWALK, CONCRETE, 411 <br />715 <br />SYD <br />$35.80 <br />$25,597.00 <br />10 <br />CURB RAMP, CONCRETE <br />16 <br />SYD <br />$207-23 <br />$3,315.68 <br />11 <br />CONCRETE CURB <br />1100 <br />LFT <br />$24.43 <br />$26,1873.00 <br />12 <br />CURB TURNOUT <br />7 <br />EA <br />$598.26 <br />$4,187.82 <br />13 <br />CONCRETE PARKING STOP <br />15 <br />EA <br />$85.00 <br />$1,27500 <br />14 <br />STORM SEWER PIPE, 12 IN <br />80 <br />LFT <br />$77.24 <br />$6,179.20 <br />15 <br />STORM CASTING REPLACEMENT <br />I <br />EA <br />$1,169.15 <br />$1,169.15 <br />16 <br />TESCO CABINET, FOUNDATION, WIRING, <br />ETC <br />1 <br />EA <br />$19,500.00 <br />$19,500.00 <br />17 <br />ELECTRICAL SERVICE CONNECTION <br />1 <br />LSUM <br />$1,750.00 <br />$1,750.00 <br />18 <br />LIGHT STANDARD, TYPE A <br />1 <br />EA <br />$4,300.00 <br />$4,300.00 <br />19 <br />LIGHT STANDARD, TYPE B <br />1 <br />EA <br />$3,500.00 <br />$3,500.00 <br />20 <br />LIGHT POLE FOUNDATION <br />2 <br />EA <br />$1,000.00 <br />$2,000.00 <br />21 <br />EV CHARGING FOUNDATION (1811x18"x18,,) <br />7 <br />EA <br />$600.00 <br />$4,200.00 <br />22 <br />LIGHTING CONDUIT, PVC, SCH 40,3 IN <br />270 <br />LFT <br />$9.75 <br />$2,632.50 <br />23 <br />LIGHTING CONDUIT, PVC, SCH 40,3 IN, <br />DIRECTION DRILL <br />50 <br />LFT <br />$25.00 <br />$1,250.00 <br />24 <br />EV CHARGING CONDUIT, PVC SCH 40,3 IN <br />375 <br />LFT <br />$9.75 <br />$3,656.25 <br />25 <br />LIGHTING WIRING <br />360 <br />LFT <br />$9-00 <br />$3,240.00 <br />26 <br />ELECTRIC PULL BOX <br />5 <br />EA <br />$650.00 <br />$3,250.00 <br />27 <br />THERMOPLASTIC LINE, SOLID, WHITE, 6 IN <br />110 <br />LFT <br />$3.95 <br />$434.50 <br />28 <br />THERMOPLASTIC LINE, SOLID, YELLOW, 4 IN <br />530 <br />LFT <br />$2.05 <br />$1,086.50 <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />