Laserfiche WebLink
Riverwalk Change Order #2 Breakdown <br />Item <br />Description <br />Cost <br />Will not appear on BPW Breakdown <br />Bank Stabilization <br />Stabilization of a failing section of riverwall to prevent future failure and erosion <br />issues <br />$ 19,459.88 <br />Self-explanatory <br />Temporary Fence <br />Add a safetyfence along the newly constructed sidewalk until the permanent <br />$ 4,375.00 <br />Self-explanatory <br />railing is installed so it can be opened to public immediately <br />Additional Restoration <br />Additional landscaping was needed to adjust drainage grades and tie in the <br />5 5,153.12 <br />"OriEinal $7,155.03; Deducted $2,001 41 for <br />protect limit into Howard Park aesthat;cally <br />overpaymcn!s from vrevious pay app items <br />Electrical Tie-in &Foundation <br />Tie-in point per the plans was non-existant; added conduit and wiring was <br />$ 8,449.40 <br />*These are covering various other overruns <br />needed to tie-in lights to other circuits <br />throughout the project; I want to save the term <br />'overruns/underruns' for a final CO If needed. <br />Added Sidewalk Replacement <br />Undermined sidewalk was re laced to allow for proper public safety <br />$ 3,552.00 <br />Added Brush Removal <br />Additional tree/brush removal was needed to proceed with work <br />$ 602.45 <br />Total CO Add = $ 41,591.85 <br />