Project Number: <br />,�yOUIH"e4;v <br />180 <br />117-083A <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Name: <br />River Walk from Beyer Street to Howard Park Change Order #: 2 <br />_ <br />DATE INITIATED: 8/15/2020 BPW DATE: 12/17/2020 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Various added items including bank stabilization for a failing section of the existing river wall, <br />temporary fencing to allow for pedestrian sidewalk use, landscaping for a more proper drainage a <br />park/trail transition, electrical circuit tie-in adjustments, and additional sidewalk fixes due to existing <br />undermining in certain areas (including minimal brush clearing). See attached breakdown. <br />Attachments: (List documents support change — required) <br />See attached price breakdown and descriptions <br />Amount of Dlncrease / El Decrease: $ 41 ,591.85 <br />Previously approved Change Order(s): $ <br />25,880.22 <br />Current Percent of Change: <br />1.29 <br />New Total Amount: $ 3,266,472.07 <br />Total Percent of Change: 2.11 <br />Funding Secured From: <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones <br />Project Inspector (Print Name) <br />REVIEWED BY: <br />PO-0001785 <br />Toy Villa <br />Construction Manager (Print Name) <br />APPROVED BY: <br />Scott Kreeger <br />Engineering Project Manager (Print Name) <br />APPROVED BY: <br />Kara Boyles <br />City Engineer (Print Name) <br />Categories (Pick One): <br />� Scope of Work <br />0 Differing Site Conditions, Changed Conditions <br />% Conflicted Specifications and Drawings <br />❑ Failed Materials <br />❑ Error <br />❑ Omission <br />❑ Final Quantity Adjustment <br />171 <br />G� <br />(Signature) <br />/b ld& <br />(Signatu ) <br />(Signature) <br />(Signature) <br />12-10-20 <br />(Date) <br />12/10/2020 <br />(Date) <br />12/10/2020 <br />(Date) <br />12/10/2020 <br />(Date) <br />