My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - River Walk from Beyer St. to Notre Dame Boathouse Proj No. 117-083 - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Change Orders
>
Change Order No 2 - River Walk from Beyer St. to Notre Dame Boathouse Proj No. 117-083 - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 12:51:40 PM
Creation date
2/26/2021 1:03:04 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/23/2021
Text box
ID:
1
Creator:
Created:
2/26/2021 1:03 PM
Modified:
2/26/2021 1:03 PM
Stamp
ID:
1
Creator:
Created:
2/26/2021 1:03 PM
Modified:
2/26/2021 1:03 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Number: <br />,�yOUIH"e4;v <br />180 <br />117-083A <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Name: <br />River Walk from Beyer Street to Howard Park Change Order #: 2 <br />_ <br />DATE INITIATED: 8/15/2020 BPW DATE: 12/17/2020 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Various added items including bank stabilization for a failing section of the existing river wall, <br />temporary fencing to allow for pedestrian sidewalk use, landscaping for a more proper drainage a <br />park/trail transition, electrical circuit tie-in adjustments, and additional sidewalk fixes due to existing <br />undermining in certain areas (including minimal brush clearing). See attached breakdown. <br />Attachments: (List documents support change — required) <br />See attached price breakdown and descriptions <br />Amount of Dlncrease / El Decrease: $ 41 ,591.85 <br />Previously approved Change Order(s): $ <br />25,880.22 <br />Current Percent of Change: <br />1.29 <br />New Total Amount: $ 3,266,472.07 <br />Total Percent of Change: 2.11 <br />Funding Secured From: <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones <br />Project Inspector (Print Name) <br />REVIEWED BY: <br />PO-0001785 <br />Toy Villa <br />Construction Manager (Print Name) <br />APPROVED BY: <br />Scott Kreeger <br />Engineering Project Manager (Print Name) <br />APPROVED BY: <br />Kara Boyles <br />City Engineer (Print Name) <br />Categories (Pick One): <br />� Scope of Work <br />0 Differing Site Conditions, Changed Conditions <br />% Conflicted Specifications and Drawings <br />❑ Failed Materials <br />❑ Error <br />❑ Omission <br />❑ Final Quantity Adjustment <br />171 <br />G� <br />(Signature) <br />/b ld& <br />(Signatu ) <br />(Signature) <br />(Signature) <br />12-10-20 <br />(Date) <br />12/10/2020 <br />(Date) <br />12/10/2020 <br />(Date) <br />12/10/2020 <br />(Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.