Laserfiche WebLink
PROPOSED FEES <br />Project #121-008 - Various Streets <br />Division of Engineering <br />City of South Bend, Indiana <br />Direct <br />Street Reconstruction: W. Poland St., W. Jefferson Blvd., S. Kindig <br />Dr., N. Fulton Ct., Portage Ct., W. Hancock St., W. Eckman St.; <br />Street Reconstruction and Milling: E. Calvert St., N. Jacob St., S. <br />Gotham Dr.E/S VII E/S VIE/S VE/S IVE/S IIIE/S IIM/D TECHTECH VITECH IVTECH AIDELabor Subtotal <br /> Direct Cost <br />Subtotal <br />Hourly Rate 69.01$ 57.10$ 49.12$ 41.84$ 34.27$ 31.85$ 47.02$ 41.96$ 29.81$ 20.67$ <br />Project Management <br />35 35 <br />Fieldwork <br />Scope 10 12 22 <br />Base Repair 15 15 <br />Sidewalk / Curb Spot Repair 15 15 <br />Retaining Wall Spot Repair 3 3 <br />Engineering <br />Plan Geometry 84 84 <br />Typical Sections / Review Pavement Cores / Design / Base Repair Detail 12 12 <br />Alignments 45 45 <br />Ramp Design 3 144 147 <br />MOT 6 6 <br />Pavement Markings 2 2 <br />QA 6 15 21 <br />Schedule of Quantities Sheets 6 30 36 <br />Cost Estimate 6 6 <br />Technical Specifications 15 15 <br />Plans / Tables / Details 84 84 <br />IDEM - Storm water Quality Control Plan 2 30 32 <br />Signage 15 15 <br />Drainage 20 20 <br />Cross Sections 3 50 53 <br />Assist City with Utility Cooordination 32 32 <br />Environmental <br />Red Flag Investigation and Submittal 8 8 <br />Conduct a Site Reconnaissance, including a WETLAND/WOUS Delineation 12 12 24 <br />Prepare Coordination Letters to, USFWS 2 2 <br />Prepare Section 401 WQC RGP Notification Rule 5 60 20 80 <br />QA/QC 20 20 <br />Survey <br />Control - Horizonal 20 20 40 <br />Control - Vertical 30 30 60 <br />Topographic Data Collection 40 40 80 <br />Notice of Survey Letters 24 24 <br />Storm / Sanitary Inventory 24 24 48 <br />Data Processing 24 24 <br />Topo Scan Extraction 64 64 <br />Field Notes 10 10 20 <br />Determine Line of Occupation 24 24 <br />Centerline Alignment Generation 24 16 40 <br />Utility Locate Survey 811 2 2 <br />QA/QC 4 <br />CAD <br />Title / Index Sheets 12 12 <br />Plan / Sheets 190 190 <br />Ramp Layout 144 144 <br />Pavement Cores 6 6 <br />Typical Sections / MOT 36 36 <br />Details 18 18 <br />Tables 6 6 <br />Signage 30 30 <br />Survey Clean-Up 60 60 <br />Review Comments 6 6 <br />Administration / Meetings <br />Public Meetings and Materials 4 4 2 10 <br />Construction Administration 5 10 15 <br />Pre-Bid Meeting / Minutes 2 4 6 <br />Pre-Construction Meeting 2 2 4 <br />Bi-Weekly Design Progress Meeting 8 8 16 <br />Direct Expenses <br />Mileage 1500 Miles @ $0.39 585.00$ <br />Pavement Cores 6,094.00$ <br />Equipment (GPS / Scanner) 10 Days @ $800.00/Day (2 Units)8,000.00$ <br /> Subtotal Labor Hours 78 382 120 102 48 254 0 715 124 0 1823 <br />Direct Labor Cost $5,382.78 $21,812.20 $5,894.40 $4,267.68 $1,644.96 $8,089.90 $0.00 $30,001.40 $3,696.44 $0.00 $80,789.76 14,679.00$ <br />Overhead 152.96%$123,576.02 <br />Fixed Fee 15%$30,654.87 <br />Direct Expenses $14,679.00 <br />$249,699.65 <br />Labor Costs <br />Total Proposed Engineering Fee