My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Road Rehabilitation of Ten (10) City Streets - Hanson Professional Services, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Road Rehabilitation of Ten (10) City Streets - Hanson Professional Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 4:09:39 PM
Creation date
2/23/2021 4:04:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/23/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />Exhibit C – Compensation Packet BC-6: Basic Services (other than RPR) – Salary Costs Times a Factor Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT C, consisting of pages, referred <br />to in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-6: Basic Services – Salary Costs Times a Factor <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Salary Costs <br />Times a Factor Method of Payment <br />A.Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1.An amount equal to Engineer’s Salary Costs times a factor of for all Basic Services <br />by principals and employees engaged directly on the Project, plus Reimbursable Expenses, <br />estimated to be $_____________________, and Engineer’s Consultant’s charges, if any, <br />estimated to be $_____________________. <br />2.Engineer’s Reimbursable Expenses Schedule is attached to this Exhibit C as Appendix 1. <br />3.The total compensation for services under Paragraph C2.01 is estimated to be <br />$_____________________ based on the following assumed distribution of compensation: <br />a.Study and Report Phase $_____________________ <br />b.Preliminary Design Phase $_____________________ <br />c.Final Design Phase $_____________________ <br />d.Bidding or Negotiating Phase $_____________________ <br />e.Construction Phase $_____________________ <br />f.Post-Construction Phase $_____________________ <br />4.Engineer may alter the distribution of compensation between individual phases of the work <br />noted herein to be consistent with services actually rendered, but shall not exceed the total <br />estimated compensation amount unless approved in writing by Owner. See also Paragraph <br />C2.03.C.2 below. <br />5.The total compensation for Engineer’s services, included in the breakdown by phases as <br />noted in Paragraph C2.01.A.3, incorporates all labor, overhead, profit, Reimbursable <br />Expenses, and Engineer’s Consultant’s charges.
The URL can be used to link to this page
Your browser does not support the video tag.