Laserfiche WebLink
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated Jan 27, 2021. <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. ___1__ <br />1.Background Data: <br />a.Effective Date of Owner-Engineer Agreement: July 28, 2020 <br />b.Owner:Board of Public Works, City of South Bend, Indiana <br />c.Engineer: Jones Petrie Rafinski Corporation <br />d.Project: Ignition Park, EV Charging Park <br />2.Description of Modifications: <br />[NOTE TO USER: Include the following paragraphs that are appropriate and delete those not applicable to <br />this amendment. Refer to paragraph numbers used in the Agreement or a previous amendment for clarity <br />with respect to the modifications to be made. Use paragraph numbers in this document for ease of <br />reference herein and in future correspondence or amendments.] <br />a.Engineer shall perform or furnish the following Additional Services: <br />The Engineer will provide the necessary coordination with the Owner and prepare the <br />required documentation and plans for a minor subdivision replat for this project. <br />Services will also include a boundary survey, as required. The Engineer will attend <br />meetings for plat approval. <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: Topographic survey, Conceptual Design, Construction Documents and <br />Specifications, Bidding and Negotiation, Construction Admin, Reimbursables. <br />c. The responsibilities of Owner are modified as follows: <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br />The additional cost of the replat work shall be $6,200 <br />e.The schedule for rendering services is modified as follows: Same as before <br />f.Other portions of the Agreement (including previous amendments, if any) are <br />modified as follows: