Laserfiche WebLink
Pinhook KitchenJanuary 20, 2021 Project Location Patrick Sherman03 <br />Demo Non-load bearing wall. <br />preserve existing <br />plumbing/electrical. Electrician to <br />demo electrical equipment. <br />Demo Door and Frame Demo Door and Frame <br />Demo existing <br />Acoustic Ceiling <br />Demo block under exiting roll-up <br />Demolition notes <br />�There is no demolition of load bearing walls or new openings in existing walls. <br />�Any new windows and doors will be in existing openings. <br />�Demolition will be done by VPA trades staff. <br />�New doors/windows will be installed into existing openings. <br />Demo existing roll-up <br />Demo existing roll-up <br />Demo existing <br />Cabinetry <br />Demo existing cabinetry <br />General Demolition Notes