Laserfiche WebLink
q <br />i <br />1 <br />LONE K <br />2/O �7 <br />...ZONE le <br />LV 1, 3,5 <br />211 <br />ZONE <br />10 <br />ZONE 10 <br />ZONE 0 <br />ZONE 10 <br />KEY PLAN <br />POWER PLAN GENERAL NOTES — TYPICAL ALL FLOORS <br />1 THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING <br />AND PATCHING REQUIRED FOR ELECTRICAL WORK, INCLUDING <br />OPENINGS REQUIRED FOR NEW CONSTRUCTION, AS WELL AS THOSE <br />OPENINGS/VOIDS CREATED BY THE REMOVAL OF EXISTING CON— <br />DUITS, BOXES, PANELBOARDS, ETC. REFER TO SPECIFICATION <br />SECTIONS 01045 — CUTTING AND PATCHING AND SECTION 09200 <br />— LATH AND PLASTER. <br />2 WHERE NEW WORK IS INDICATED ON EXISTING WALLS IN <br />FINISHED SPACES, IT IS INTENDED THAT THE WALL BE <br />CHANNELED FOR THE WORK. THIS INCLUDES, BUT IS NOT <br />LIMITED TO, CONVENIENCE OUTLETS, TELEPHONE/COMPUTER <br />OUTLETS, FIRE ALARM DEVICES, ETC. <br />3 STUB A 3/4" CONDUIT FROM EACH TELEPHONE/COMPUTER WALL <br />OUTLET AND TURN OUT OF THE WALL ABOVE THE ACCESSIBLE <br />CEILING IN EACH AREA. TYPICAL. <br />4 ALL ISOLATED GROUND RECEP CIRCUITS SHALL INCLUDE BOTH A( <br />DEDICATED GROUNDING CONDUCTOR AND DEDICATED NEUTRAL <br />CONDUCTOR, THE NEUTRAL CONDUCTOR SHALL NOT SERVE ANY <br />OTHER CIRCUITS — PROVIDE A SEPARATE NEUTRAL FOR OTHER <br />CIRCUITS IN THE RACEWAY SYSTEM. <br />5 REFER TO REFLECTED CEILING PLANS FOR COORDINATION OF <br />SMOKE DETECTOR LOCATIONS. <br />SECOND FLOOR — NORTH KEYNOTES <br />TERMINAL UNIT. 1/2 HP 277V. 3.1 FLA. <br />TERMINAL UNIT. 1/4 HP 277V. 1.6 FLA. <br />TERMINAL UNIT. 1/3 HP 277V. 1.8 FLA. <br />TERMINAL UNIT. (2) 1/3 HP 277V. 4.05 FLA. <br />TERMINAL UNIT. 1/5 HP 277V. 0.6 FLA. <br />TERMINAL UNIT. 1/8 HP 277V. 1.0 FLA <br />THRU—FLOOR COMBINATION SERVICE PEDESTAL WITH ONE 7/8" <br />DIA. OPENING FOR FLEXIBLE CONDUIT AND ONE INSULATED <br />BUSHING <br />3/4"C TO CABLE TRAY. <br />GFI RECEP MTD. HORIZONTALLY IN BACKSPLASH. ARRANGE <br />WIRING TO PROTECT DOWNSTREAM RECEPS. <br />INSTALL SMOKE DETECTOR AT TOP OF ELEVATOR SHAFT. <br />PROVIDE REMOTE LED INDICATOR. <br />STUB CABLE TRAY INTO EXISTING VERTICAL CHASE FOR ACCESS <br />TO FIRST FLOOR. SEAL PENETRATION TO MAINTAIN FIRE <br />RATING. <br />CABLE TRAY ABOVE CEILING. <br />EF-1. 1/4 HP 115V. PROVIDE MAN. FRACT. HP MOTOR <br />STARTER. CONTROL IS BY ENERGY MANAGEMENT SYSTEM. <br />4" SQ. BOX FOR FUTURE VIDEO EQUIPMENT. STUB 1/2"C TO <br />ABOVE ACCESSIBLE CEILING. <br />THIS PROJECT INCORPORATES A RETURN AIR PLENUM <br />Plumbing and Mechanical note: no plastic <br />pipe shall be used above finished ceiling. <br />Electrical note: return air rated plenum <br />cable to be used for all low voltage applica- <br />tions. All line voltage wiring to be in an <br />approved raceway. <br />General note: No combustible materials are <br />to be located in the plenum area. Wood may <br />be used if fire treated to meet the required <br />flame andsmoke ratings. However, it is <br />recommended that no wood be used. <br />RENOVATION OF <br />CENTRAL HIGH SCHOOL <br />SOUTH BEND COMMUNITY SCHOOL CORPORATION <br />SECOND FLOOR PLAN -NORTH <br />POWER PLAN <br />Project No. <br />87264.00 <br />Dote <br />AUGUST 16, 1989 <br />Scale <br />1/8"=1'0" <br />Revisions <br />Drawn By <br />BOB /DLS <br />, 0,,fff.,e.,... <br />VAR Ale/ •. <br />.J....q• `. <br />• <br />o. 37 <br />srer( . <br />• <br />THE TROYER GROUP LNG <br />Flaming, Design and Management Services tar the Built Environment <br />❑ 415 Lincolmey Fast wahaaka, Indiana 4E644 (219)759-9076 <br />❑ 202 South Fifth St. (behen, Indiana 46526 (219)53439:12 <br />Sheet <br />E2.5 <br />