Laserfiche WebLink
0 <br />• <br />44 <br />PUSHBUTTON <br />STAT I ON <br />EJ IONS 1 -r <br />•ZoNE 2 <br />L �- <br />/////// // <br />+ZONE 2 <br />D/s7WECT TO COM6..XMO,i<E <br />DETEG TO/Q/ POOR NOGG <br />OPEN AND W/FF W FQCP <br />FD ZONE ( *ZONE 2 <br />CP <br />LV G11 <br />10 <br />ZONE 2 <br />1 LV'.a <br />+ZONE 2. <br />LV I <br />I i - <br />LVb <br />ZONE 2 <br />lI <br />1 <br />- 1---� <br />uP <br />ZONE <br />11 <br />ZONE 1 <br />ZONE 2 <br />ZONE 3 <br />ZONE 4 <br />ZONE 5 <br />ZONE 6 <br />ZONE 7 <br />ZONE 8 <br />ZONE 9 <br />ZONE 10 <br />ZONE 11 <br />ZONE 12 <br />ZONE 13 <br />ZONE 14 <br />ZONE 15 <br />ZONE 16 <br />ZONE 17 <br />ZONE 18 <br />ZONE 19 <br />ZONE 20 <br />ZONE 21 <br />ZONE 22 <br />ZONE 23 <br />ZONE 24 <br />ZONE 25 <br />ZONE 26 <br />ZONE 27 <br />ZONE 28 <br />ZONE 29 <br />ZONE 30 <br />ZONE 31 <br />ZONE 32 <br />ZONE 33 <br />ZONE 34 <br />ZONE 35 <br />ZONE 36 <br />ZONE 37 <br />ZONE 38 <br />ZONE 39 <br />ZONE 40 <br />ZONE 41 <br />ZONE 42 <br />ZONE 43 <br />ZONE 44 <br />FIRE ALARM ZONES <br />GROUND FLOOR NORTH STATIONS <br />GROUND FLOOR NORTH DETECTORS <br />GROUND FLOOR SOUTH STATIONS <br />GROUND FLOOR SOUTH DETECTORS <br />FIRST FLOOR NORTH STATIONS <br />FIRST FLOOR NORTH DETECTORS <br />FIRST FLOOR SOUTH STATIONS <br />FIRST FLOOR SOUTH DETECTORS <br />SECOND FLOOR NORTH STATIONS <br />SECOND FLOOR NORTH DETECTORS <br />SECOND FLOOR SOUTH STATIONS <br />SECOND FLOOR SOUTH DETECTORS <br />THIRD FLOOR STATIONS <br />THIRD iLOOR DETECTORS <br />MECHANICAL ROOM STATION <br />MECHANICAL ROOM DETECTORS <br />AHU-1 DUCT DETECTORS <br />AHU-2 DUCT DETECTORS <br />MAIN SPRINKLER FLOW SWITCH <br />MAIN SPRINKLER TROUBLE SWITCH <br />SPRINKLERFLOW — GROUND FLOOR NORTH <br />SPRINKLER TROUBLE — GROUND FLOOR NORTH <br />SPRINKLER FLOW — GROUND FLOOR EAST <br />SPRINKLER TROUBLE — GROUND FLOOR EAST <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />FLOW — GROUND FLOOR SOUTH <br />TROUBLE — GROUND FLOOR SOUTH <br />FLOW — FIRST FLOOR NORTH <br />TROUBLE — FIRST FLOOR NORTH <br />FLOW — FIRST FLOOR EAST <br />TROUBLE — FIRST FLOOR EAST <br />FLOW — FIRST FLOOR SOUTH <br />TROUBLE — FIRST FLOOR SOUTH <br />FLOW — SECOND FLOOR NORTH <br />TROUBLE — SECOND FLOOR NORTH <br />FLOW — SECOND FLOOR EAST <br />TROUBLE — SECOND FLOOR EAST <br />SPRINKLER FLOW — SECOND FLOOR SOUTH <br />SPRINKLER TROUBLE — SECOND FLOOR SOUTH <br />SPRINKLER FLOW — THIRD FLOOR SOUTH <br />SPRINKLER TROUBLE — THIRD FLOOR SOUTH <br />SPACE <br />SPACE <br />SPACE <br />SPACE <br />KEY PLAN <br />POWER PLAN GENERAL NOTES — ICAL ALL FLOORS <br />1 THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING <br />AND PATCHING REQUIRED FOR ELECTRICAL WORK, INCLUDING <br />OPENINGS REQUIRED FOR NEW CONSTRUCTION, AS WELL AS THOSE <br />OPENINGS/VOIDS CREATED BY THE REMOVAL OF EXISTING CON— <br />DUITS, BOXES, PANELBOARDS, ETC. REFER TO SPECIFICATION <br />SECTIONS 01045 — CUTTING AND PATCHING AND SECTION 09200 <br />— LATH AND PLASTER. <br />2 WHERE NEW WORK. IS INDICATED ON EXISTING WALLS IN <br />FINISHED SPACES, IT IS INTENDED THAT THE WALL BE <br />CHANNELED FOR TUE WORK. THIS INCLUDES, BUT IS NOT <br />LIMITED TO, CONVENIENCE OUTLETS, TELEPHONE/COMPUTER <br />OUTLETS, FIRE ALARM DEVICES, ETC. <br />3 STUB A 3/4" CONDUIT FROM EACH TELEPHONE/COMPUTER WALL <br />OUTLET AND TURN OUT OF THE WALL ABOVE THE ACCESSIBLE <br />CEILING IN EACH AREA. TYPICAL. <br />4 ALL ISOLATED GROUND RECEP CIRCUITS SHALL INCLUDE BOTH A <br />DEDICATED GROUNDING CONDUCTOR AND DEDICATED NEUTRAL <br />CONDUCTOR. THE NEUTRAL CONDUCTOR SHALL NOT SERVE ANY <br />OTHER CIRCUITS — PROVIDE A SEPARATE NEUTRAL FOR OTHER <br />CIRCUITS rN THE RACEWAY SYSTEM. <br />5 REFA0 REFLECTED CEILING PLANS FOR COORDINATION OF <br />SMO DETECTOR LOCATIONS. <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />Q <br />23 <br />GROUND FLOOR — NORTH KEYNOTES <br />CABINET HEATER. 1/30 HP 115V. <br />UNIT HEATER. 1/6 HP 115V. <br />TERMINAL UNIT. (2) 1/3 HP 277V. 4.05 FLA. <br />TERMINAL UNIT. 1/3 HP 277V. 1.8 FLA. <br />TERMINAL UNIT. 1/15 HP 277V. 0.6 FLA. <br />TERMINAL UNIT. 1.4 HP 277V. 1.6 FLA. <br />TERMINAL UNIT. 1/2 HP 277V. 3.1 FLA. <br />COMBINATION SERVICE PEDESTAL WITH ONE 7/8" DIA. OPENING <br />FOR FLEXIBLE CONDUIT AND ONE INSULATED BUSHING. (NOT A <br />THRU—FLOOR DEVICE.) <br />3/4"C TO CABLE TRAY. <br />CABLE TRAY ABOVE CEILING. <br />GFI RECEP MTD. HORIZONTALLY IN BACKSPLASH. ARRANGE <br />WIRING TO PROTECT DOWNSTREAM RECEPS. <br />ELEVATOR MOTOR — REFER TO ONE LINE DIAGRAM. <br />MOUNT RECEP ON. ELEVATOR PIT WALL. <br />STUB CABLE TRAY INTO EXISTING VERTICAL CHASE FOR ACCESS <br />TO FIRST FLOOR. SEAL PENETRATION TO MAINTAIN FIRE <br />RATING. <br />LIFT. 10 HP 460V 3 PHASE. 30A/3P 600V NON —FUSED <br />DISCONNECT SWITCH. 3— #10, 3/4"C TO 25A/3P C.B. WIRE TO <br />(2) PUSHBUTTON STATIONS. <br />SLIDING DOOR OPERATOR. 115V. <br />EXTEND 120V CIRCUIT TO HALON FIRE SYSTEM. <br />PROVIDE RELAY @ TERMINAL UNIT WITH 277V CONTACTS AND <br />120V COIL WIRED TO HALON FIRE SYSTEM TO DE —ENERGIZE <br />TERM. UNIT WHEN HALON SYSTEM IS ACTIVATED. <br />DUPLEX SEWAGE LIFT PUMPS IN TUNNEL BELOW. (2) 2 HP <br />460V 3 PHASE. WIRE TO CONTROL PANEL. 3— #12, 3/4"C TO <br />20A/3P C.B. <br />4— #12, 3/4"C TO TROUBLE BELL/SILENCE SWITCH AND TROUBLE <br />LIGHT TO BE LOCATED IN ROOM 052. <br />EF8. 50VA 120V. PROVIDE MAN. FRACT. HP MOTOR STARTER. <br />WIRE THRU REVERSE ACTING T'STAT. <br />4" SQ. BOX FOR FUTURE VIDEO EQUIPMENT. STU$ 1/2"C TO <br />ABOVE ACCESSIBLE CEILING. <br />EXISTING TRASH COMPACTOR RELOCATED. 480V 3 PHASE. <br />RELOCATE CONTROL PANEL SO IT IS ACCESSIBLE FROM EAST <br />SIDE OF UNIT. PROVIDE 30A/3P 600V NON —FUSIBLE <br />DISCONNECT SWITCH. <br />THIS PROJECT INCORPORATES A RETURN AIR PLENUM <br />Plumbing and Mechanical note: no plastic <br />pipe shall be used above finished ceiling. <br />Electrical note: return air rated plenum <br />cable to be used for all low voltage applica- <br />tions. All line voltage wiring to be in an <br />approved raceway. <br />General note: No combustible materials are <br />to be located in the plenum area. Wood may <br />be used if fire treated to meet the required <br />flame and smoke ratings. However, it is <br />recommended that no wood be used. <br />RENOVATION OF <br />CENTRAL HIGH SCHOOL <br />SOUTH BEND COMMUNITY SCHOOL CORPORATION <br />GROUND FLOOR PLAN -NORTH <br />POWER PLAN <br />Project No. <br />87264.00 <br />Dote <br />AUGUST :16, 1989 <br />Scale <br />1/8"=1'0" <br />Revisions <br />Drawn By <br />BOB /DLS <br />els GC0•....:..NU� <br />••s= <br />EA • <br />7 <br />F <br />- _ TROYER <br />111 Planning. Design and Ilnagmont Services for the Built Enrirasssnt <br />O 415 Lincolnway East Mishawaka, Indiana 46544 (210258-9076 <br />MAE 0 202 South Fif th St. (,bdnn, Indiana 46525 (219)554-3502 <br />Sheet <br />E2.1 <br />1;j <br />