My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
317 West Washington Street_BLUEPRINT Central High School New Education Vol II
sbend
>
Public
>
Historic Preservation
>
Temporary
>
Central High BLUEPRINTS
>
317 West Washington Street_BLUEPRINT Central High School New Education Vol II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 2:04:34 PM
Creation date
2/19/2021 3:04:54 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
317 West Washington Street
HPC Document Type
Blueprint
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />• <br />44 <br />PUSHBUTTON <br />STAT I ON <br />EJ IONS 1 -r <br />•ZoNE 2 <br />L �- <br />/////// // <br />+ZONE 2 <br />D/s7WECT TO COM6..XMO,i<E <br />DETEG TO/Q/ POOR NOGG <br />OPEN AND W/FF W FQCP <br />FD ZONE ( *ZONE 2 <br />CP <br />LV G11 <br />10 <br />ZONE 2 <br />1 LV'.a <br />+ZONE 2. <br />LV I <br />I i - <br />LVb <br />ZONE 2 <br />lI <br />1 <br />- 1---� <br />uP <br />ZONE <br />11 <br />ZONE 1 <br />ZONE 2 <br />ZONE 3 <br />ZONE 4 <br />ZONE 5 <br />ZONE 6 <br />ZONE 7 <br />ZONE 8 <br />ZONE 9 <br />ZONE 10 <br />ZONE 11 <br />ZONE 12 <br />ZONE 13 <br />ZONE 14 <br />ZONE 15 <br />ZONE 16 <br />ZONE 17 <br />ZONE 18 <br />ZONE 19 <br />ZONE 20 <br />ZONE 21 <br />ZONE 22 <br />ZONE 23 <br />ZONE 24 <br />ZONE 25 <br />ZONE 26 <br />ZONE 27 <br />ZONE 28 <br />ZONE 29 <br />ZONE 30 <br />ZONE 31 <br />ZONE 32 <br />ZONE 33 <br />ZONE 34 <br />ZONE 35 <br />ZONE 36 <br />ZONE 37 <br />ZONE 38 <br />ZONE 39 <br />ZONE 40 <br />ZONE 41 <br />ZONE 42 <br />ZONE 43 <br />ZONE 44 <br />FIRE ALARM ZONES <br />GROUND FLOOR NORTH STATIONS <br />GROUND FLOOR NORTH DETECTORS <br />GROUND FLOOR SOUTH STATIONS <br />GROUND FLOOR SOUTH DETECTORS <br />FIRST FLOOR NORTH STATIONS <br />FIRST FLOOR NORTH DETECTORS <br />FIRST FLOOR SOUTH STATIONS <br />FIRST FLOOR SOUTH DETECTORS <br />SECOND FLOOR NORTH STATIONS <br />SECOND FLOOR NORTH DETECTORS <br />SECOND FLOOR SOUTH STATIONS <br />SECOND FLOOR SOUTH DETECTORS <br />THIRD FLOOR STATIONS <br />THIRD iLOOR DETECTORS <br />MECHANICAL ROOM STATION <br />MECHANICAL ROOM DETECTORS <br />AHU-1 DUCT DETECTORS <br />AHU-2 DUCT DETECTORS <br />MAIN SPRINKLER FLOW SWITCH <br />MAIN SPRINKLER TROUBLE SWITCH <br />SPRINKLERFLOW — GROUND FLOOR NORTH <br />SPRINKLER TROUBLE — GROUND FLOOR NORTH <br />SPRINKLER FLOW — GROUND FLOOR EAST <br />SPRINKLER TROUBLE — GROUND FLOOR EAST <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />SPRINKLER <br />FLOW — GROUND FLOOR SOUTH <br />TROUBLE — GROUND FLOOR SOUTH <br />FLOW — FIRST FLOOR NORTH <br />TROUBLE — FIRST FLOOR NORTH <br />FLOW — FIRST FLOOR EAST <br />TROUBLE — FIRST FLOOR EAST <br />FLOW — FIRST FLOOR SOUTH <br />TROUBLE — FIRST FLOOR SOUTH <br />FLOW — SECOND FLOOR NORTH <br />TROUBLE — SECOND FLOOR NORTH <br />FLOW — SECOND FLOOR EAST <br />TROUBLE — SECOND FLOOR EAST <br />SPRINKLER FLOW — SECOND FLOOR SOUTH <br />SPRINKLER TROUBLE — SECOND FLOOR SOUTH <br />SPRINKLER FLOW — THIRD FLOOR SOUTH <br />SPRINKLER TROUBLE — THIRD FLOOR SOUTH <br />SPACE <br />SPACE <br />SPACE <br />SPACE <br />KEY PLAN <br />POWER PLAN GENERAL NOTES — ICAL ALL FLOORS <br />1 THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING <br />AND PATCHING REQUIRED FOR ELECTRICAL WORK, INCLUDING <br />OPENINGS REQUIRED FOR NEW CONSTRUCTION, AS WELL AS THOSE <br />OPENINGS/VOIDS CREATED BY THE REMOVAL OF EXISTING CON— <br />DUITS, BOXES, PANELBOARDS, ETC. REFER TO SPECIFICATION <br />SECTIONS 01045 — CUTTING AND PATCHING AND SECTION 09200 <br />— LATH AND PLASTER. <br />2 WHERE NEW WORK. IS INDICATED ON EXISTING WALLS IN <br />FINISHED SPACES, IT IS INTENDED THAT THE WALL BE <br />CHANNELED FOR TUE WORK. THIS INCLUDES, BUT IS NOT <br />LIMITED TO, CONVENIENCE OUTLETS, TELEPHONE/COMPUTER <br />OUTLETS, FIRE ALARM DEVICES, ETC. <br />3 STUB A 3/4" CONDUIT FROM EACH TELEPHONE/COMPUTER WALL <br />OUTLET AND TURN OUT OF THE WALL ABOVE THE ACCESSIBLE <br />CEILING IN EACH AREA. TYPICAL. <br />4 ALL ISOLATED GROUND RECEP CIRCUITS SHALL INCLUDE BOTH A <br />DEDICATED GROUNDING CONDUCTOR AND DEDICATED NEUTRAL <br />CONDUCTOR. THE NEUTRAL CONDUCTOR SHALL NOT SERVE ANY <br />OTHER CIRCUITS — PROVIDE A SEPARATE NEUTRAL FOR OTHER <br />CIRCUITS rN THE RACEWAY SYSTEM. <br />5 REFA0 REFLECTED CEILING PLANS FOR COORDINATION OF <br />SMO DETECTOR LOCATIONS. <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />Q <br />23 <br />GROUND FLOOR — NORTH KEYNOTES <br />CABINET HEATER. 1/30 HP 115V. <br />UNIT HEATER. 1/6 HP 115V. <br />TERMINAL UNIT. (2) 1/3 HP 277V. 4.05 FLA. <br />TERMINAL UNIT. 1/3 HP 277V. 1.8 FLA. <br />TERMINAL UNIT. 1/15 HP 277V. 0.6 FLA. <br />TERMINAL UNIT. 1.4 HP 277V. 1.6 FLA. <br />TERMINAL UNIT. 1/2 HP 277V. 3.1 FLA. <br />COMBINATION SERVICE PEDESTAL WITH ONE 7/8" DIA. OPENING <br />FOR FLEXIBLE CONDUIT AND ONE INSULATED BUSHING. (NOT A <br />THRU—FLOOR DEVICE.) <br />3/4"C TO CABLE TRAY. <br />CABLE TRAY ABOVE CEILING. <br />GFI RECEP MTD. HORIZONTALLY IN BACKSPLASH. ARRANGE <br />WIRING TO PROTECT DOWNSTREAM RECEPS. <br />ELEVATOR MOTOR — REFER TO ONE LINE DIAGRAM. <br />MOUNT RECEP ON. ELEVATOR PIT WALL. <br />STUB CABLE TRAY INTO EXISTING VERTICAL CHASE FOR ACCESS <br />TO FIRST FLOOR. SEAL PENETRATION TO MAINTAIN FIRE <br />RATING. <br />LIFT. 10 HP 460V 3 PHASE. 30A/3P 600V NON —FUSED <br />DISCONNECT SWITCH. 3— #10, 3/4"C TO 25A/3P C.B. WIRE TO <br />(2) PUSHBUTTON STATIONS. <br />SLIDING DOOR OPERATOR. 115V. <br />EXTEND 120V CIRCUIT TO HALON FIRE SYSTEM. <br />PROVIDE RELAY @ TERMINAL UNIT WITH 277V CONTACTS AND <br />120V COIL WIRED TO HALON FIRE SYSTEM TO DE —ENERGIZE <br />TERM. UNIT WHEN HALON SYSTEM IS ACTIVATED. <br />DUPLEX SEWAGE LIFT PUMPS IN TUNNEL BELOW. (2) 2 HP <br />460V 3 PHASE. WIRE TO CONTROL PANEL. 3— #12, 3/4"C TO <br />20A/3P C.B. <br />4— #12, 3/4"C TO TROUBLE BELL/SILENCE SWITCH AND TROUBLE <br />LIGHT TO BE LOCATED IN ROOM 052. <br />EF8. 50VA 120V. PROVIDE MAN. FRACT. HP MOTOR STARTER. <br />WIRE THRU REVERSE ACTING T'STAT. <br />4" SQ. BOX FOR FUTURE VIDEO EQUIPMENT. STU$ 1/2"C TO <br />ABOVE ACCESSIBLE CEILING. <br />EXISTING TRASH COMPACTOR RELOCATED. 480V 3 PHASE. <br />RELOCATE CONTROL PANEL SO IT IS ACCESSIBLE FROM EAST <br />SIDE OF UNIT. PROVIDE 30A/3P 600V NON —FUSIBLE <br />DISCONNECT SWITCH. <br />THIS PROJECT INCORPORATES A RETURN AIR PLENUM <br />Plumbing and Mechanical note: no plastic <br />pipe shall be used above finished ceiling. <br />Electrical note: return air rated plenum <br />cable to be used for all low voltage applica- <br />tions. All line voltage wiring to be in an <br />approved raceway. <br />General note: No combustible materials are <br />to be located in the plenum area. Wood may <br />be used if fire treated to meet the required <br />flame and smoke ratings. However, it is <br />recommended that no wood be used. <br />RENOVATION OF <br />CENTRAL HIGH SCHOOL <br />SOUTH BEND COMMUNITY SCHOOL CORPORATION <br />GROUND FLOOR PLAN -NORTH <br />POWER PLAN <br />Project No. <br />87264.00 <br />Dote <br />AUGUST :16, 1989 <br />Scale <br />1/8"=1'0" <br />Revisions <br />Drawn By <br />BOB /DLS <br />els GC0•....:..NU� <br />••s= <br />EA • <br />7 <br />F <br />- _ TROYER <br />111 Planning. Design and Ilnagmont Services for the Built Enrirasssnt <br />O 415 Lincolnway East Mishawaka, Indiana 46544 (210258-9076 <br />MAE 0 202 South Fif th St. (,bdnn, Indiana 46525 (219)554-3502 <br />Sheet <br />E2.1 <br />1;j <br />
The URL can be used to link to this page
Your browser does not support the video tag.