My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
317 West Washington Street_BLUEPRINT Central High School New Education Vol II
sbend
>
Public
>
Historic Preservation
>
Temporary
>
Central High BLUEPRINTS
>
317 West Washington Street_BLUEPRINT Central High School New Education Vol II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 2:04:34 PM
Creation date
2/19/2021 3:04:54 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
317 West Washington Street
HPC Document Type
Blueprint
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ON. TO <br />BB INVERTER BB <br />DIMMER <br />RACKS <br />UP TO HIGH BAY <br />WORK LIGHTS <br />r--1 <br />I I <br />I I <br />I I <br />I I <br />I I <br />CIRCUIT \‘A" <br />CIRCUIT `°B" <br />UP TO HIGH BAY <br />WORK LIGHT <br />STAGE <br />MANAGER'S <br />PANEL <br />b PCS_ 30" <br />LONG FIXTURE <br />TYPE Y <br />DIMMER <br />RACKS <br />18;i <br />I <br />STAGE MC'R <br />PNL _ CKr. <br />EM <br />5TAb - ri\c g , <br />3F s. 461ILONG <br />FIXTUR-E <br />A6 <br />3IDS_72IILO,k, <br />FIX- <br />LV 8 <br />B-Eh <br />1: �I <br />REFER TO EXTERIOR LTG. <br />CONTROL WIRING DIAGRAM <br />ON DWG. EI.2 <br />LY1-5 <br />LIGHTING PLAN GENERAL NOTES - TYPICAL ALL FLOORS <br />1. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL CUTTING <br />AND PATCHING REQUIRED FOR ELECTRICAL WORK, INCLUDING <br />OPENINGS REQUIRED FOR NEW CONSTRUCTION, AS WELL AS THOSE <br />OPENINGS/VOIDS CREATED BY -.THE REMOVAL OF EXISTING CON- <br />DUITS, BOXES, PANELBOARDS, ETC. REFER TO SPECIFICATION <br />SECTIONS 01045 - CUTTING AND PATCHING AND SECTION 09200 <br />- LATH AND PLASTER. <br />2. WHERE NEW WORK IS INDICATED ON EXISTING WALLS IN <br />FINISHED SPACES, IT IS INTENDED THAT THE WALL BE <br />CHANNELED FOR THE WORK. THIS INCLUDES, BUT IS NOT <br />LIMITED TO, OUTLET BOXES FOR WALL BRACKET/SCONCE <br />FIXTURES, SWITCH BOXES, ETC. <br />REFER TO EXTERIOR LTG • <br />- <br />CONTROL WIRING DIAGRAM <br />ON DWG. EI.2 <br />KEY PLAN <br />r• <br />THIS PROJECT INCORPORATES A RETURN AIR PLENUM <br />Plumbing and Mechanical°note: no plastic <br />pipe shall be used above finished ceiling. <br />Electrical note: return air rated plenum <br />cable to be used for all low voltage applica- <br />tions. All line voltage wiring to be in an <br />approved raceway. <br />General note: No combustible materials are <br />to be located in the plenum area. Wood may <br />be used if fire treated to meet the required <br />flame and smoke ratings. However, it is <br />recommended that no wood be used. <br />RENOVATION OF <br />CENTRAL HIGH SCHOOL <br />SOUTH BEND COMMUNITY SCHOOL CORPORATION <br />FIRST FLOOR PLAN -SOUTH <br />NEW LIGHTING LAYOUT <br />Project No. <br />87264.00 <br />Da to <br />AUGUST 16, 1989 <br />Revisions <br />Scale Drawn By <br />1/8"=110" DJL <br />THE TROYER GROUP. <br />Planning, Design and Mtnag. sst Services for the Built Envirormat <br />❑ 415 Liming East Mattock, Indiana 46544 (219)259-9076 <br />0 2D2 South Fifth St. 0nehsn. Indiaea 46526 (219)5.34-3502 <br />0. 37., <br />••` • YDIAt4... \ <br />' II G; <br />0 se <br />y. <br />001 <br />Sheet <br />E1.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.