My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Additional Funding for Lead & Copper Rule Risk Management Evaluatio – Black and Veatch Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Additional Funding for Lead & Copper Rule Risk Management Evaluatio – Black and Veatch Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 2:28:20 PM
Creation date
2/9/2021 2:27:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 <br />(Exhibit B – Owner's Responsibilities) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />N.If more than one prime contract is to be awarded for the Work designed or specified by Engineer, <br />designate a person or entity to have authority and responsibility for coordinating the activities <br />among the various prime Contractors, and define and set forth the duties, responsibilities, and <br />limitations of authority of such individual or entity and the relation thereof to the duties, <br />responsibilities, and authority of Engineer as an attachment to this Exhibit B that is to be mutually <br />agreed upon and made a part of this Agreement before such services begin. <br />O.Attend the pre-bid conference, bid opening, pre-construction conferences, construction progress <br />and other job related meetings, and Substantial Completion and final payment visits to the Project. <br />P.Provide the services of an independent testing laboratory to perform all inspections, tests, and <br />approvals of samples, materials, and equipment required by the Contract Documents, or to <br />evaluate the performance of materials, equipment, and facilities of Owner, prior to their <br />incorporation into the Work with appropriate professional interpretation thereof. <br />Q.Provide Engineer with the findings and reports generated by the entities providing services to <br />Owner pursuant to this paragraph. <br />R.Inform Engineer in writing of any specific requirements of safety or security programs that are <br />applicable to Engineer, as a visitor to the Site. <br />S.Perform or provide the following additional services: <br />1.Additional on-site assistance during hydrant flow testing. <br />2.Calibration of additional hydrant flow testing sites other than those specified herein.
The URL can be used to link to this page
Your browser does not support the video tag.