My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Additional Funding for Lead & Copper Rule Risk Management Evaluatio – Black and Veatch Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Additional Funding for Lead & Copper Rule Risk Management Evaluatio – Black and Veatch Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 2:28:20 PM
Creation date
2/9/2021 2:27:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit B – Owner's Responsibilities) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT B, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br />Owner’s Responsibilities <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties. <br />B2.01 In addition to other responsibilities of Owner as set forth in this Agreement, Owner shall at its <br />expense: <br />A.Provide Engineer with all criteria and full information as to Owner’s requirements for the Project, <br />including design objectives and constraints, space, capacity and performance requirements, <br />flexibility, and expandability, and any budgetary limitations; and furnish copies of all design and <br />construction standards which Owner will require to be included in the Drawings and <br />Specifications; and furnish copies of Owner’s standard forms, conditions, and related documents <br />for Engineer to include in the Bidding Documents, when applicable. <br />B.Furnish to Engineer any other available information pertinent to the Project including reports and <br />data relative to previous designs, or investigation at or adjacent to the Site. <br />C.Following Engineer’s assessment of initially-available Project information and data and upon <br />Engineer’s request, furnish or otherwise make available such additional Project related information <br />and data as is reasonably required to enable Engineer to complete its Basic and Additional <br />Services. Such additional information or data would generally include the following: <br />1.Property descriptions. <br />2.Zoning, deed, and other land use restrictions. <br />3.Property, boundary, easement, right-of-way, and other special surveys or data, including <br />establishing relevant reference points. <br />4.Explorations and tests of subsurface conditions at or contiguous to the Site, drawings of <br />physical conditions relating to existing surface or subsurface structures at the Site, or <br />hydrographic surveys, with appropriate professional interpretation thereof. <br />5.Environmental assessments, audits, investigations, and impact statements, and other <br />relevant environmental or cultural studies as to the Project, the Site, and adjacent areas. <br />6.Data or consultations as required for the Project but not otherwise identified in the <br />Agreement or the Exhibits thereto. <br />D.Give prompt written notice to Engineer whenever Owner observes or otherwise becomes aware of <br />the presence at the Site of any Constituent of Concern, or of any other development that affects the
The URL can be used to link to this page
Your browser does not support the video tag.