My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Additional Funding for Lead & Copper Rule Risk Management Evaluatio – Black and Veatch Corporation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Additional Funding for Lead & Copper Rule Risk Management Evaluatio – Black and Veatch Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 2:28:20 PM
Creation date
2/9/2021 2:27:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 12 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />18.Preparation of operation and maintenance manuals. <br />19.Preparing to serve or serving as a consultant or witness for Owner in any litigation, <br />arbitration, or other dispute resolution process related to the Project. <br />20.Providing more extensive services required to enable Engineer to issue notices or <br />certifications requested by Owner. <br />21.Assistance in connection with the adjusting of Project equipment and systems. <br />22.Assistance to Owner in training Owner’s staff to operate and maintain Project equipment <br />and systems. <br />23.Assistance to Owner in developing procedures for (a) control of the operation and <br />maintenance of Project equipment and systems, and (b) related record-keeping. <br />24.Overtime work requiring higher than regular rates. <br />25.Other services performed or furnished by Engineer not otherwise provided for in this <br />Agreement. <br />26.Water quality modeling and follow-up workshop/meeting to discuss results. <br />27.Regulatory review as it pertains to lead and copper in the Owner’s distribution system. <br />28.Risk management plan development and follow-up workshop/meeting as it pertains to lead <br />and copper in the Owner’s distribution system. <br />A2.02 Additional Services Not Requiring Owner’s Written Authorization <br />A.Engineer shall advise Owner in advance that Engineer is will immediately commence to perform <br />or furnish the Additional Services of the types listed below. For such Additional Services, <br />Engineer need not request or obtain specific advance written authorization from Owner. Engineer <br />shall cease performing or furnishing such Additional Services upon receipt of written notice from <br />Owner. <br />1.Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2.Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than “or-equal” items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract. <br />3.Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages.
The URL can be used to link to this page
Your browser does not support the video tag.