My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to OEA - Addition to Cover Potholing for Lincoln Way– Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2021
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to OEA - Addition to Cover Potholing for Lincoln Way– Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 2:27:06 PM
Creation date
2/9/2021 2:26:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/9/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of 3 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated February 11, 2020. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 1 <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />February 11, 2020 <br /> <br />b. <br /> <br />Owner: <br /> <br />City of South Bend <br /> <br />c. <br /> <br />Engineer: <br /> <br />Abonmarche Consultants, Inc. <br /> <br />d. <br /> <br />Project: <br /> <br />Lincoln Way West and Olive Street <br /> <br />2. Description of Modifications: <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Subsurface Underground Investigation: Perform vacuum excavation of potential <br />conflicts between the proposed work and existing utilities to determine the <br />horizontal and vertical location of the existing utilities. The attached sketch shows <br />the six locations that have been identified to be a potential conflict. <br /> <br />b. For the Additional Services or the modifications to services set forth above,Owner <br />shall pay Engineer the following additional or modified compensation: <br /> <br />$11,730.00 <br /> <br />c. The schedule for rendering services is modified as follows: <br /> <br />10 days from authorization <br /> <br /> <br /> <br />5. Agreement Summary (Reference only) <br /> a. Original Agreement amount: $_ 126,350.00 _______ <br /> b. Net change for prior amendments: $_______0.00_ ______ <br /> c. This amendment amount: $___11,845.00_______ <br /> d. Adjusted Agreement amount: $__138,195.00_______ <br /> <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C.
The URL can be used to link to this page
Your browser does not support the video tag.